Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (836)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (53)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
Casino at Dania Beach
Project
Casino at Dania Beach Keller successfully installed 288 auger cast piles in low headroom conditions. Casino at Dania Beach The project The Casino at Dania Beach received a $64M renovation, including…
/projects/casino-dania-beach
Met Square High Rise
Project
Met Square High Rise Keller saved time by reducing the pile installation schedule from 14 weeks to 8 weeks and without disturbing ancient Tequesta Indian remains. Met Square High Rise An aerial of…
/projects/met-square-high-rise
Edmonton Arena District Shoring Pits
Project
Edmonton Arena District Shoring Pits Keller worked with the owner and general contractor to develop an in-depth traffic management plan for work adjacent to high volume vehicle traffic and…
/projects/edmonton-arena-district-shoring-pits
Edmonton South LRT Extension
Project
Edmonton South LRT Extension Keller completed a quality control/assurance program to ensure their work was completed properly while their chemical grouting program eliminated the need for post-…
/projects/edmonton-south-lrt-extension
Maritime Link Transmission Line
Project
Maritime Link Transmission Line Extreme cold weather and high winds were no match for Keller as they assisted Rokstad Power in erecting a power transmission line from Stephenville to Cape Ray.…
/projects/maritime-link-transmission-line
Glencore Mine
Project
Glencore Mine Keller was hired to design and install 234 no. soil-bonded micropiles to support the new structures of the Secondary Off-Gas project at the Glencore Mine. Glencore Mine micropiles…
/projects/glencore-mine
Muskrat Falls Emergency Repairs
Project
Muskrat Falls Emergency Repairs Keller implemented fracture grouting and compaction grouting to reduce water seepage through the cofferdam to allow construction activities to continue. Muskrat Falls…
/projects/muskrat-falls-emergency-repairs
Ingersoll Plant Expansion
Project
Ingersoll Plant Expansion Keller's design-build solution of tie-down anchors helped with the expansion of The Oxford County Waste Water Treatment Plant (WWTP). Ingersoll Plant Expansion The…
/projects/ingersoll-plant-expansion
Tunnel Boring Machine Rescue Shaft
Project
Tunnel Boring Machine Rescue Shaft Keller assisted the City of Edmonton in the excavation and recovery of a Tunnel Boring Machine (TBM). Tunnel Boring Machine Rescue Shaft Recovery of the Tunnel…
/projects/tunnel-boring-machine-rescue-shaft
NWMO Deep Grouting Trial – Phase 2
Project
NWMO Deep Grouting Trial – Phase 2 Keller implemented lessons learned from Phase 1 into Phase 2 to improve productivity and mitigate risks in the deep grouting trial for the NWMO. NWMO Deep Grouting…
/projects/nwmo-deep-grouting-trial-phase-2
NWMO Deep Grouting Trial – Phase 1
Project
NWMO Deep Grouting Trial – Phase 1 Keller drilled and grouted for Phase 1 of a deep grouting trial being executed to determine parameters for the pre-treatment of the underlying rock formation. NWMO…
/projects/nwmo-deep-grouting-trial-phase-1
AMD No. 4 Line
Project
AMD No. 4 Line Keller used a shotcrete and soil nailing solution for this project because of its flexibility to deal with conditions on-site. AMD No. 4 Line micropiles The project The ArcelorMittal…
/projects/amd-no-4-line
BMO Field Expansion
Project
BMO Field Expansion A significant amount of planning and input by Keller accelerated the construction schedule, satisfied the design requirements, and mitigated potential risks associated with…
/projects/bmo-field-expansion
Atomic Energy of Canada – Chalk River
Project
Atomic Energy of Canada – Chalk River Keller quickly adapted to the changing subsurface conditions installing, both Drilled Displacement Piles (DDP) and Continuous Flight Auger (CFA) piles. Atomic…
/projects/atomic-energy-canada-chalk-river
Ottawa Light Rail Transit
Project
Ottawa Light Rail Transit When a significant sinkhole developed above the Ottawa Light Rail Transit (OLRT) tunnel, Keller worked on an aggressive construction schedule in limited working space.…
/projects/ottawa-light-rail-transit
River District
Project
River District Keller overcame difficult ground conditions to complete work safely within the client's compressed schedule. River District The project Vancouver has steadily increased in…
/projects/river-district
The Shore
Project
The Shore Keller conducted a ground improvement solution for The Shore, a new mixed-use structure. The Shore vibro replacement The project Rise Commercial Developments planned a new 6-storey mixed-…
/projects/shore
Port Coquitlam Recreation Centre
Project
Port Coquitlam Recreation Centre Keller installed driven piles for the phased Port Coquitlam (PoCo) Recreation Centre to complete the scope of work safely and efficiently. Port Coquitlam Recreation…
/projects/port-coquitlam-recreation-centre
Aragon Development Complex
Project
Aragon Development Complex Keller successfully completed their first cutter soil mixing (CSM) project in Canada one week ahead of schedule. Aragon Development Complex crew The crew that worked on…
/projects/aragon-development-complex
17th Street Canal Floodwall Remediation
Project
17th Street Canal Floodwall Remediation Keller used two triple axis jet grouting machines that were able to do the entire contract 33% faster than the anticipated schedule, resulting in a project…
/projects/17th-street-canal-floodwall-remediation

Pagination

  • Previous page ‹‹
  • Page 16
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe