Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Casino at Dania Beach
Project
Casino at Dania Beach Keller successfully installed 288 auger cast piles in low headroom conditions. Casino at Dania Beach The project The Casino at Dania Beach received a $64M renovation, including…
/projects/casino-dania-beach
Met Square High Rise
Project
Met Square High Rise Keller saved time by reducing the pile installation schedule from 14 weeks to 8 weeks and without disturbing ancient Tequesta Indian remains. Met Square High Rise An aerial of…
/projects/met-square-high-rise
Edmonton Arena District Shoring Pits
Project
Edmonton Arena District Shoring Pits Keller worked with the owner and general contractor to develop an in-depth traffic management plan for work adjacent to high volume vehicle traffic and…
/projects/edmonton-arena-district-shoring-pits
Edmonton South LRT Extension
Project
Edmonton South LRT Extension Keller completed a quality control/assurance program to ensure their work was completed properly while their chemical grouting program eliminated the need for post-…
/projects/edmonton-south-lrt-extension
Maritime Link Transmission Line
Project
Maritime Link Transmission Line Extreme cold weather and high winds were no match for Keller as they assisted Rokstad Power in erecting a power transmission line from Stephenville to Cape Ray.…
/projects/maritime-link-transmission-line
Glencore Mine
Project
Glencore Mine Keller was hired to design and install 234 no. soil-bonded micropiles to support the new structures of the Secondary Off-Gas project at the Glencore Mine. Glencore Mine micropiles…
/projects/glencore-mine
Muskrat Falls Emergency Repairs
Project
Muskrat Falls Emergency Repairs Keller implemented fracture grouting and compaction grouting to reduce water seepage through the cofferdam to allow construction activities to continue. Muskrat Falls…
/projects/muskrat-falls-emergency-repairs
Ingersoll Plant Expansion
Project
Ingersoll Plant Expansion Keller's design-build solution of tie-down anchors helped with the expansion of The Oxford County Waste Water Treatment Plant (WWTP). Ingersoll Plant Expansion The…
/projects/ingersoll-plant-expansion
Tunnel Boring Machine Rescue Shaft
Project
Tunnel Boring Machine Rescue Shaft Keller assisted the City of Edmonton in the excavation and recovery of a Tunnel Boring Machine (TBM). Tunnel Boring Machine Rescue Shaft Recovery of the Tunnel…
/projects/tunnel-boring-machine-rescue-shaft
NWMO Deep Grouting Trial – Phase 2
Project
NWMO Deep Grouting Trial – Phase 2 Keller implemented lessons learned from Phase 1 into Phase 2 to improve productivity and mitigate risks in the deep grouting trial for the NWMO. NWMO Deep Grouting…
/projects/nwmo-deep-grouting-trial-phase-2
NWMO Deep Grouting Trial – Phase 1
Project
NWMO Deep Grouting Trial – Phase 1 Keller drilled and grouted for Phase 1 of a deep grouting trial being executed to determine parameters for the pre-treatment of the underlying rock formation. NWMO…
/projects/nwmo-deep-grouting-trial-phase-1
AMD No. 4 Line
Project
AMD No. 4 Line Keller used a shotcrete and soil nailing solution for this project because of its flexibility to deal with conditions on-site. AMD No. 4 Line micropiles The project The ArcelorMittal…
/projects/amd-no-4-line
BMO Field Expansion
Project
BMO Field Expansion A significant amount of planning and input by Keller accelerated the construction schedule, satisfied the design requirements, and mitigated potential risks associated with…
/projects/bmo-field-expansion
Atomic Energy of Canada – Chalk River
Project
Atomic Energy of Canada – Chalk River Keller quickly adapted to the changing subsurface conditions installing, both Drilled Displacement Piles (DDP) and Continuous Flight Auger (CFA) piles. Atomic…
/projects/atomic-energy-canada-chalk-river
Ottawa Light Rail Transit
Project
Ottawa Light Rail Transit When a significant sinkhole developed above the Ottawa Light Rail Transit (OLRT) tunnel, Keller worked on an aggressive construction schedule in limited working space.…
/projects/ottawa-light-rail-transit
River District
Project
River District Keller overcame difficult ground conditions to complete work safely within the client's compressed schedule. River District The project Vancouver has steadily increased in…
/projects/river-district
The Shore
Project
The Shore Keller conducted a ground improvement solution for The Shore, a new mixed-use structure. The Shore vibro replacement The project Rise Commercial Developments planned a new 6-storey mixed-…
/projects/shore
Port Coquitlam Recreation Centre
Project
Port Coquitlam Recreation Centre Keller installed driven piles for the phased Port Coquitlam (PoCo) Recreation Centre to complete the scope of work safely and efficiently. Port Coquitlam Recreation…
/projects/port-coquitlam-recreation-centre
Aragon Development Complex
Project
Aragon Development Complex Keller successfully completed their first cutter soil mixing (CSM) project in Canada one week ahead of schedule. Aragon Development Complex crew The crew that worked on…
/projects/aragon-development-complex
17th Street Canal Floodwall Remediation
Project
17th Street Canal Floodwall Remediation Keller used two triple axis jet grouting machines that were able to do the entire contract 33% faster than the anticipated schedule, resulting in a project…
/projects/17th-street-canal-floodwall-remediation
Pagination
Previous page
‹‹
Page 16
Next page
››