Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Robinson Landing
Project
Robinson Landing Despite the challenges of working on the Potomac River adjacent to historic buildings and the discovery of an old ship's hull, Keller constructed a watertight TRD earth…
/projects/robinson-landing
Petrochemical Sump and Pipe Support
Project
Petrochemical Sump and Pipe Support Keller completed the sheet pile and helical pile installation in restricted access conditions safely and on time in a busy petrochemical facility. Petrochemical…
/projects/petrochemical-sump-and-pipe-support
345kV CREZ Transmission Line
Project
345kV CREZ Transmission Line Keller was called in to apply their drilled shaft expertise to 96 miles of Competitive Renewable Energy Zones (CREZ) transmission line through west Texas. 345kV CREZ…
/projects/345kv-crez-transmission-line
Knox Transmission Lines
Project
Knox Transmission Lines Keller successfully installed foundations in limited access drilling conditions, while minimizing the impact to homeowners adjacent to the construction zone. Knox Transmission…
/projects/knox-transmission-lines
Kenedy to Tuleta Tranmission Lines
Project
Kenedy to Tuleta Tranmission Lines A Keller employee received a “Gold Coin” Award from AEP Safety for outstanding job site safety during this project. Kenedy to Tuleta Tranmission Lines The project…
/projects/kenedy-tuleta-tranmission-lines
Andrews County South Transmission Line
Project
Andrews County South Transmission Line Keller successfully provided access for over 7 miles of the Right of Way through sand dunes and in extreme desert weather conditions. Andrews County South…
/projects/andrews-county-south-transmission-line
Audenried High School
Project
Audenried High School Construction of a new high school in historic Philadelphia required treatment of 20 feet of urban fill. Ground improvement was used to treat the poor subgrade soils. Audenried…
/projects/audenried-high-school
Wickiup Dam
Project
Wickiup Dam Wickiup Dam was built on materials that were likely to liquefy in the event of an earthquake. Keller was able to stabilize the soil in place to prevent this occurrence. Wickiup Dam…
/projects/wickiup-dam
Liquified Natural Gas Manufacturing Facility
Project
Liquified Natural Gas Manufacturing Facility Phosphate contamination of the groundwater beneath a proposed LNG equipment manufacturing facility required groundwater control. A vibrated beam slurry…
/projects/lng-manufacturing-facility
Michigan State University Spartan Stadium Expansion
Project
Michigan State University Spartan Stadium Expansion Expansion and renovation of the historic Michigan State Spartan football stadium required foundation underpinning. Limited information about the…
/projects/spartan-stadium-expansion
Distribution Facility Expansion
Project
Distribution Facility Expansion A state-of-the-art, 1.4 million square foot distribution facility was to be constructed in Memphis, Tennessee. Ground improvement was used to treat the very poor,…
/projects/distribution-facility-expansion
1600 Museum Park
Project
1600 Museum Park Despite neighboring properties consisting of a commuter railroad, townhouses, and an electrical substation, Keller installed an earth retention system to support a 32-story…
/projects/1600-museum-park
Northwest School
Project
Northwest School Modernization of the historic Northwest School required tight access earth retention and shoring from inside of the existing structure. Northwest School Interior renovations and a…
/projects/northwest-school
Faraday Launching Tunnel Shaft
Project
Faraday Launching Tunnel Shaft During shaft construction, water and soil inflow resulted in a sinkhole at the surface. Keller repaired the leak using jet grouting and densified the loosened soils…
/projects/faraday-launching-tunnel-shaft
Lexington Landslide
Project
Lexington Landslide The Lexington Landslide required quick action and flexibility to save the luxury apartment complexes at the bottom of the slide from destruction. Lexington Landslide completed…
/projects/lexington-landslide
Yucca Loma Bridge
Project
Yucca Loma Bridge Yucca Loma Bridge over the Mojave River was constructed to relieve traffic congestion in Los Angeles. Bridge foundations required drilling through difficult subsurface conditions.…
/projects/yucca-loma-bridge
BNSF Bridge Sherman
Project
BNSF Bridge Sherman Critical releveling work needed to be done on the BNSF Bridge Sherman to ensure the safety of passing trains and passengers. Work was completed with minimal disruption to the…
/projects/bnsf-bridge-sherman
Schoharie County Office Complex
Project
Schoharie County Office Complex A cutoff wall was constructed to reduce the impact of flooding to the Schoharie County Office Complex. The office serves as the Courthouse, DMV, and County Office…
/projects/schoharie-county-office-complex
Burton Family Football Complex
Project
Burton Family Football Complex A new football complex was slated for construction on the UConn Storrs campus. Ground improvement was chosen to meet the off-season construction schedule. Burton Family…
/projects/burton-family-football-complex
Walmart SuperCenter
Project
Walmart SuperCenter Keller designed and installed an earthquake drain system to mitigate liquefaction concerns for a new Walmart SuperCenter. Walmart SuperCenter earthquake drains Installing wick…
/projects/walmart-supercenter
Pagination
Page 1
Next page
››