Keller delivers practiced displacement piling construction services.
Process
Displacement piling is a distinct application for use in particular fixed soil conditions. Displacement piles replace the material they are driven into when the project owner wants to maintain the piling spoils in the ground, or the soil’s makeup calls for this type of piling.
Keller has the required equipment and construction process to complete even the most demanding displacement piling North American projects that call for exclusive planning, inventive engineering, and an individualized approach.
Common uses
- Structural support
- Ground improvement
Advantages
- Maintaining piling spoils in the ground
- Minimal vibration
- Minimal amount of spoil
Related Solutions
Related projects
Commercial
Lake Nona Wave Hotel
Located in the heart of Lake Nona’s foremost entertainment and shopping destination, the 16-story Wave Hotel, with its distinctive ocean wave silhouette, is the latest addition to a 100-acre town center planned mixed-use community.
Commercial
The Wharf, Phase 2
Keller delivers multiple techniques for a redevelopment project in D.C. along the Potomac River.
Industrial and manufacturing
Atomic Energy of Canada – Chalk River
Keller quickly adapted to the changing subsurface conditions installing, both Drilled Displacement Piles (DDP) and Continuous Flight Auger (CFA) piles.
Infrastructure
Orlando Airport Intermodal Facility
Keller worked to successfully complete the displacement pile scope of work on time and on budget. This project received the ENR Southeast Award of Merit in 2018.