Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Missouri State Route 249 Interchange
Project
Missouri State Route 249 Interchange Grouting methods and micropiles were implemented to support proposed bridge footings, MSE walls, box culverts, and to stabilize an abandoned mine. Missouri State…
/projects/missouri-state-route-249-interchange
Kaneohe/Kailua Sewer Tunnel
Project
Kaneohe/Kailua Sewer Tunnel In support of tunneling operations, Keller installed slurry wall access and exit shafts, and a comprehensive ground improvement program along the tunnel alignment. Kaneohe…
/projects/kaneohekailua-sewer-tunnel
Sound Transit Light Rail - Northgate Link Extension (Contract N125)
Project
Sound Transit Light Rail - Northgate Link Extension (Contract N125) By accepting an alternate design concept by means of slurry walls, the project team saved on schedule. Sound Transit Northgate Link…
/projects/sound-transit-light-rail-n125
Dearborn CSO Contracts 7 & 8
Project
Dearborn CSO Contracts 7 & 8 To reduce the inflow of gas and artesian water into the proposed CSO shaft excavations, Keller conducted a comprehensive drilling and grouting program. It is one of…
/projects/dearborn-cso-contracts-7-8
Mosaic Potash Mine K2 Shaft
Project
Mosaic Potash Mine K2 Shaft This interesting grouting project was performed from a 75 feet diameter circular mine station, at a depth of 2,760 feet below the surface. Mosaic Potash Mine K2 Shaft The…
/projects/mosaic-potash-mine-k2-shaft
Francis E. Walter Dam and Reservoir Remediation
Project
Francis E. Walter Dam and Reservoir Remediation Keller self-performed all of the drilling work, which required resonant sonic drilling through the overburden (to depths up to 240 feet through the…
/projects/dam-reservoir-remediation
IHNC Storm Surge Barrier
Project
IHNC Storm Surge Barrier Keller used a multi-axis jet grout machine that allowed the project to move ahead of schedule. IHNC Storm Surge Barrier The project Hurricane Katrina hit the city of New…
/projects/ihnc-storm-surge-barrier
Bay Area Rapid Transit Authority Warm Springs Extension
Project
Bay Area Rapid Transit Authority Warm Springs Extension Keller’s innovative solution to perform the jet grouting using several multi-axis (Bi-Jet) machines enabled the construction of the project to…
/projects/bart-authority-warm-springs-extension
DC Clean Rivers Project – Blue Plains Tunnel
Project
DC Clean Rivers Project – Blue Plains Tunnel Reinforced Diaphragm Slurry Walls provided initial support during shaft excavation and also formed part of the permanent structure. DC Clean Rivers…
/projects/blue-plains-tunnel
Clearwater Lake Dam
Project
Clearwater Lake Dam Keller used four of its state-of-the-art hydromills to install the Clearwater Dam cutoff wall. Clearwater Lake Dam aerial The project The Clearwater Lake earth embankment dam was…
/projects/clearwater-lake-dam
Third Street Light Rail Program
Project
Third Street Light Rail Program Simultaneous execution of multiple foundation techniques at three small sites with limited staging availability and laydown areas in a densely populated downtown…
/projects/third-street-light-rail-program
Echo Brickell Residences
Project
Echo Brickell Residences Keller performed a first-of-its-kind testing program to verify the load capacity required of the tangent bearing elements (TBEs) for one of the tallest buildings in South…
/projects/echo-brickell-residences
Privé at Island Residences
Project
Privé at Island Residences Keller completed the auger cast piles project ahead of schedule despite the logistical challenges of working on an island with only one access road. Privé at Island…
/projects/prive-island-residences
Plaza at Coral Gables
Project
Plaza at Coral Gables Keller designed a custom pile installation program to combat obstructed ground conditions and save the client time and money. Plaza at Coral Gables rendering A rendering of the…
/projects/plaza-coral-gables
Orlando Airport Intermodal Facility
Project
Orlando Airport Intermodal Facility Keller worked to successfully complete the displacement pile scope of work on time and on budget. This project received the ENR Southeast Award of Merit in 2018.…
/projects/orlando-airport-intermodal-facility
Casino at Dania Beach
Project
Casino at Dania Beach Keller successfully installed 288 auger cast piles in low headroom conditions. Casino at Dania Beach The project The Casino at Dania Beach received a $64M renovation, including…
/projects/casino-dania-beach
Met Square High Rise
Project
Met Square High Rise Keller saved time by reducing the pile installation schedule from 14 weeks to 8 weeks and without disturbing ancient Tequesta Indian remains. Met Square High Rise An aerial of…
/projects/met-square-high-rise
Edmonton Arena District Shoring Pits
Project
Edmonton Arena District Shoring Pits Keller worked with the owner and general contractor to develop an in-depth traffic management plan for work adjacent to high volume vehicle traffic and…
/projects/edmonton-arena-district-shoring-pits
Edmonton South LRT Extension
Project
Edmonton South LRT Extension Keller completed a quality control/assurance program to ensure their work was completed properly while their chemical grouting program eliminated the need for post-…
/projects/edmonton-south-lrt-extension
Maritime Link Transmission Line
Project
Maritime Link Transmission Line Extreme cold weather and high winds were no match for Keller as they assisted Rokstad Power in erecting a power transmission line from Stephenville to Cape Ray.…
/projects/maritime-link-transmission-line
Pagination
Previous page
‹‹
Page 15
Next page
››