Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (836)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (53)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
Kaiser Permanente Medical Offices
Project
Kaiser Permanente Medical Offices In response to soils loosened by unplanned demolition of the majority of existing foundation piers, Keller quickly adapted its jet grouting underpinning and shoring…
/projects/kaiser-permanente-medical-offices
Laboratory Building
Project
Laboratory Building High attention to safety and detail on this tight, challenging site coupled with an efficient work effort ensured the project was safely completed within schedule. Laboratory…
/projects/laboratory-building
Mississinewa Lake Dam
Project
Mississinewa Lake Dam Keller completed the Mississinewa Lake Dam foundation remediation by constructing a cut-off wall for seepage control. Mississinewa Lake Dam aerial The project Mississinewa Dam…
/projects/mississinewa-lake-dam
Lockport Pool Approach Dike
Project
Lockport Pool Approach Dike The construction of a concrete cutoff wall reduced seepage and increased stability at this dike structure. Lockport Pool Approach Dike The project The USACE Rock Island…
/projects/lockport-pool-approach-dike
Second Avenue Subway, Phase 1
Project
Second Avenue Subway, Phase 1 Slurry walls were utilized in the construction of a massive cut-and-cover TBM launch box for this challenging tunnel project. Second Avenue Subway, Phase 1 The project…
/projects/second-avenue-subway-phase-1
Missouri State Route 249 Interchange
Project
Missouri State Route 249 Interchange Grouting methods and micropiles were implemented to support proposed bridge footings, MSE walls, box culverts, and to stabilize an abandoned mine. Missouri State…
/projects/missouri-state-route-249-interchange
Kaneohe/Kailua Sewer Tunnel
Project
Kaneohe/Kailua Sewer Tunnel In support of tunneling operations, Keller installed slurry wall access and exit shafts, and a comprehensive ground improvement program along the tunnel alignment. Kaneohe…
/projects/kaneohekailua-sewer-tunnel
Sound Transit Light Rail - Northgate Link Extension (Contract N125)
Project
Sound Transit Light Rail - Northgate Link Extension (Contract N125) By accepting an alternate design concept by means of slurry walls, the project team saved on schedule. Sound Transit Northgate Link…
/projects/sound-transit-light-rail-n125
Dearborn CSO Contracts 7 & 8
Project
Dearborn CSO Contracts 7 & 8 To reduce the inflow of gas and artesian water into the proposed CSO shaft excavations, Keller conducted a comprehensive drilling and grouting program. It is one of…
/projects/dearborn-cso-contracts-7-8
Mosaic Potash Mine K2 Shaft
Project
Mosaic Potash Mine K2 Shaft This interesting grouting project was performed from a 75 feet diameter circular mine station, at a depth of 2,760 feet below the surface. Mosaic Potash Mine K2 Shaft The…
/projects/mosaic-potash-mine-k2-shaft
Francis E. Walter Dam and Reservoir Remediation
Project
Francis E. Walter Dam and Reservoir Remediation Keller self-performed all of the drilling work, which required resonant sonic drilling through the overburden (to depths up to 240 feet through the…
/projects/dam-reservoir-remediation
IHNC Storm Surge Barrier
Project
IHNC Storm Surge Barrier Keller used a multi-axis jet grout machine that allowed the project to move ahead of schedule. IHNC Storm Surge Barrier The project Hurricane Katrina hit the city of New…
/projects/ihnc-storm-surge-barrier
Bay Area Rapid Transit Authority Warm Springs Extension
Project
Bay Area Rapid Transit Authority Warm Springs Extension Keller’s innovative solution to perform the jet grouting using several multi-axis (Bi-Jet) machines enabled the construction of the project to…
/projects/bart-authority-warm-springs-extension
DC Clean Rivers Project – Blue Plains Tunnel
Project
DC Clean Rivers Project – Blue Plains Tunnel Reinforced Diaphragm Slurry Walls provided initial support during shaft excavation and also formed part of the permanent structure. DC Clean Rivers…
/projects/blue-plains-tunnel
Clearwater Lake Dam
Project
Clearwater Lake Dam Keller used four of its state-of-the-art hydromills to install the Clearwater Dam cutoff wall. Clearwater Lake Dam aerial The project The Clearwater Lake earth embankment dam was…
/projects/clearwater-lake-dam
Third Street Light Rail Program
Project
Third Street Light Rail Program Simultaneous execution of multiple foundation techniques at three small sites with limited staging availability and laydown areas in a densely populated downtown…
/projects/third-street-light-rail-program
Echo Brickell Residences
Project
Echo Brickell Residences Keller performed a first-of-its-kind testing program to verify the load capacity required of the tangent bearing elements (TBEs) for one of the tallest buildings in South…
/projects/echo-brickell-residences
Privé at Island Residences
Project
Privé at Island Residences Keller completed the auger cast piles project ahead of schedule despite the logistical challenges of working on an island with only one access road. Privé at Island…
/projects/prive-island-residences
Plaza at Coral Gables
Project
Plaza at Coral Gables Keller designed a custom pile installation program to combat obstructed ground conditions and save the client time and money. Plaza at Coral Gables rendering A rendering of the…
/projects/plaza-coral-gables
Orlando Airport Intermodal Facility
Project
Orlando Airport Intermodal Facility Keller worked to successfully complete the displacement pile scope of work on time and on budget. This project received the ENR Southeast Award of Merit in 2018.…
/projects/orlando-airport-intermodal-facility

Pagination

  • Previous page ‹‹
  • Page 15
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe