Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro replacement (stone columns)
        • Wet soil mixing
        • Wick drains (PVDs)
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • Trenched soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (854)
  • Project (345)
  • Event (122)
  • News article (103)
  • Office (70)
  • Resource (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (5)
Request a quote
Get assistance
Cooper River Bridge
Project
Cooper River Bridge Keller completed this project that was scheduled to take 2 years in just 18 months. Cooper River Bridge aerial The project Massive drilled shafts were installed for SCDOT’s Cooper…
/projects/cooper-river-bridge
Leo Frigo Bridge Rehabilitation
Project
Leo Frigo Bridge Rehabilitation Keller completed all drilled shaft construction in less than 30 calendar days. Leo Frigo Bridge Rehabilitation Keller crew installing drilled shafts under the Leo…
/projects/leo-frigo-bridge-rehabilitation
Lake Travis Raw Water Intake Tunnel
Project
Lake Travis Raw Water Intake Tunnel Keller installed large diameter shafts to an extreme depth and completed the work safely and ahead of schedule. Lake Travis Raw Water Intake Tunnel The project A…
/projects/lake-travis-raw-water-intake-tunnel
Lake Champlain Bridge
Project
Lake Champlain Bridge During construction, Keller used multiple rock drilling techniques (reverse circulation bits, as well as downhole hammers) depending on the conditions encountered. Lake…
/projects/lake-champlain-bridge
Hurricane Deck Bridge
Project
Hurricane Deck Bridge Keller completed construction well ahead of schedule, allowing the completed bridge to open for traffic three months early. Hurricane Deck Bridge The project Hurricane Deck…
/projects/hurricane-deck-bridge
Edwardsport Integrated Gasification Combined Cycle
Project
Edwardsport Integrated Gasification Combined Cycle Keller's extensive load test program provided actual in-situ design values, which ultimately allowed for the most efficient, cost-effective…
/projects/edwardsport-igcc
Deep Rock Tunnel Connector
Project
Deep Rock Tunnel Connector Keller completed construction of the tunnel nearby to downtown Indianapolis, so crews worked successfully within extremely small footprints. Deep Rock Tunnel Connector The…
/projects/deep-rock-tunnel-connector
DC United Soccer Stadium
Project
DC United Soccer Stadium Keller completed the work within an aggressive schedule for design and installation to meet the overall project schedule. DC United Soccer Stadium The project A new 20,000-…
/projects/dc-united-soccer-stadium
CSX Creek Bridge Replacements
Project
CSX Creek Bridge Replacements Keller performed this dual bridge project using percussion rock drills and conventional rock removal methods. CSX Creek Bridge Replacements The project The CSX…
/projects/csx-creek-bridge-replacements
Cleveland Convention Center and Hotel
Project
Cleveland Convention Center and Hotel Keller experimented and succeeded in using a large-scale European hydraulic drill rig to install deep rock socketed caissons with heavy, full-length permanent…
/projects/cleveland-convention-center-and-hotel
Burlington Camden Reliability Project
Project
Burlington Camden Reliability Project Keller installed several drilled shafts with a custom-built, low clearance rig with a drill attachment in order to clear the 45-foot height limitation.…
/projects/burlington-camden-reliability-project
Whiting Refinery Modernization
Project
Whiting Refinery Modernization Keller performed this $80 million project, within the active units of an operating oil refinery. Whiting Refinery Modernization The project BP’s ‘Operation Canadian…
/projects/whiting-refinery-modernization
Block 37
Project
Block 37 Keller met the challenges of this complex and fast-tracked project utilizing drilled shaft, slurry, and secant wall techniques. Block 37 The project Block 37 was to be repurposed as a…
/projects/block-37
Avens Bridge - South Holston Lake
Project
Avens Bridge - South Holston Lake Keller's innovative redesign of the floating platform helped overcome low water conditions. Avens Bridge - South Holston Lake The project Avens Bridge sees some…
/projects/avens-bridge-south-holston-lake
Expertise
Landing page
Expertise Techniques Keller offers a market-leading portfolio of techniques such as micropiles, ground freezing, auger cast piles, and more. Keller offers a market-leading portfolio of techniques…
/expertise
ATI Hot-Rolling and Processing Facility
Project
ATI Hot-Rolling and Processing Facility Keller constructed a water-tight secant retaining structure for the ATI Hot-Rolling and Processing Facility. ATI Hot-Rolling and Processing Facility 128 secant…
/projects/ati-hot-rolling-and-processing-facility
New Jersey High-Speed Rail Improvement
Project
New Jersey High-Speed Rail Improvement Keller performed construction in an active electrified railroad environment using specialized high rail and low overhead drill equipment. New Jersey High-Speed…
/projects/new-jersey-high-speed-rail-improvement
200 North Michigan Avenue
Project
200 North Michigan Avenue Keller protected existing adjacent structures' foundations while drilling at several locations containing existing timber piles. 200 North Michigan Avenue drilled…
/projects/200-north-michigan-avenue
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation
Project
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation Keller installed jet grout columns to provide structural support to the failing Brooklyn Marine Terminal 8 bulkhead. Brooklyn Marine Terminal 8…
/projects/brooklyn-marine-terminal-8
Hart Street Wastewater Pump Station Force Main Replacement
Project
Hart Street Wastewater Pump Station Force Main Replacement Jet grouted columns provide soil stabilization and support to piers piles, bearing 500-ton crane loads, during the construction of twin 48-…
/projects/hart-street-wwps

Pagination

  • Previous page ‹‹
  • Page 7
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe