Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro replacement (stone columns)
Wet soil mixing
Wick drains (PVDs)
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
Trenched soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
McClelland Transmission Line
Project
McClelland Transmission Line Keller offered an accelerated schedule to complete all work in a single phase rather than the two originally planned and was able to assist in finishing ahead of the…
/projects/mcclelland-transmission-line
Nashville International Airport
Project
Nashville International Airport Keller safely installed drilled shafts among other subcontractors and completed the project while allowing the airport to run simultaneously during construction.…
/projects/nashville-international-airport
Fort Lauderdale Airport Expansion
Project
Fort Lauderdale Airport Expansion A new runway was planned on 60 feet of fill, overlying swamp-like soils at the Fort Lauderdale-Hollywood Airport. Ground improvement was used to meet the…
/projects/fort-lauderdale-airport-expansion
Rocksprings Wind
Project
Rocksprings Wind Keller quickly mobilized for remediation of unsuitable building sites for five proposed wind towers. Rocksprings Wind The project Surface and subsurface voids were encountered during…
/projects/rocksprings-wind
MIT.nano Center
Project
MIT.nano Center Keller constructed earth retention and groundwater control to allow a 12 to 20-foot deep excavation for the MIT.nano Center research facility without affecting the adjacent sensitive…
/projects/mitnano-center
National Corvette Museum Sinkhole
Project
National Corvette Museum Sinkhole Eight Corvettes were swallowed when a three-story deep sinkhole opened up directly beneath the National Corvette Museum. Our team mobilized within hours to provide…
/projects/national-corvette-museum-sinkhole
Eglinton Cross Passages
Project
Eglinton Cross Passages Keller improved surrounding soil to facilitate the tunnel construction of the Eglinton Crosstown light rail line. Eglinton Cross Passages Keller customized the drilling and…
/projects/eglinton-cross-passages
Bloomington Station
Project
Bloomington Station Keller provided a variety of ground improvement techniques while completing work two weeks in advance of schedule. Bloomington Station The project Metrolinx is building a new GO…
/projects/bloomington-station
Shand Carbon Capture Test Facility
Project
Shand Carbon Capture Test Facility Keller successfully completed construction within the operating power generating facility with zero safety incidents recorded. Shand Carbon Capture Test Facility…
/projects/shand-carbon-capture-test-facility
New Post Creek Generating Station
Project
New Post Creek Generating Station Keller continuously provided slurry material 24 hours per day, 7 days a week using an automated grout plant to complete the project. New Post Creek Generating…
/projects/new-post-creek-generating-station
Kanata West Pumping Station
Project
Kanata West Pumping Station Keller developed, designed, and constructed the optimal solution using multiple techniques to meet the project requirements. Kanata West Pumping Station The project The…
/projects/kanata-west-pumping-station
The Shipyards
Project
The Shipyards Keller installed a cantilevered wall, which was value-engineered to save the client more than $500k. The Shipyards The project Supply and installation of a secant pile wall with…
/projects/shipyards
96th Avenue
Project
96th Avenue Keller provided earth retention for a new building and completed the project in eight weeks with zero lost-time incidents. 96th Avenue The project Weststone Developments was constructing…
/projects/96th-avenue
Sunset Road Bridge
Project
Sunset Road Bridge Keller installed all twenty-one drilled shafts under very challenging slurry drilling techniques without any shaft remediation or repairs required. Sunset Road Bridge drilled shaft…
/projects/sunset-road-bridge
Loop 101 Project
Project
Loop 101 Project Keller completed drilled shaft installation safely while working next to an active highway. Loop 101 Project The project The Loop 101 Project planned to add new lanes in both…
/projects/loop-101-project
Vogtle Electric Generating Plant
Project
Vogtle Electric Generating Plant Keller was responsible for the excavation, survey, fabrication, and placement of reinforcing steel, handling/stockpiling of drill spoils, backfilling shafts poured…
/projects/vogtle-electric-generating-plant
OSIS Augmentation and Relief Sewer Tunnel
Project
OSIS Augmentation and Relief Sewer Tunnel Keller assisted in the completion of the OARS tunnel project, which helped Columbus reduce the environmental impacts caused by Combined Sewer Overflows (CSOs…
/projects/osis-augmentation-relief-sewer-tunnel
NSTAR Lower SEMA 345kV Transmission Line
Project
NSTAR Lower SEMA 345kV Transmission Line Keller successfully and safely performed work for the new 345kV transmission line that was adjacent to existing energized lines. NSTAR Lower SEMA 345kV…
/projects/nstar-lower-sema-345kv-transmission-line
North Central Reliability Project
Project
North Central Reliability Project Keller implemented and followed stringent environmental protocols due to work occurring in residential neighborhoods as well as many wetland areas. North Central…
/projects/north-central-reliability-project
Mullica River Bridge Widening
Project
Mullica River Bridge Widening Keller's success using drilled shafts in the sand formations of Southern NJ allowed the engineer and owner to see that this is a viable option in the area for…
/projects/mullica-river-bridge-widening
Pagination
Previous page
‹‹
Page 6
Next page
››