Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro replacement (stone columns)
        • Wet soil mixing
        • Wick drains (PVDs)
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • Trenched soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (854)
  • Project (345)
  • Event (122)
  • News article (103)
  • Office (70)
  • Resource (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (5)
Request a quote
Get assistance
Download
https://youtu.be/tH5uVBMoz1I
Robinson Landing project video
Resource
Robinson Landing project video Constructing the TRD wall at Robinson Landing. Video Despite the challenges of working on the Potomac River adjacent to historic buildings and the discovery of an old…
/node/3246
26th Street Emergency Repairs
Project
26th Street Emergency Repairs Our team responded to the emergency quickly and began work within days of the collapse. We found the optimal solution that reduced impact to the surrounding neighborhood…
/projects/26th-street-emergency-repairs
San Diego River Bridge Double Track
Project
San Diego River Bridge Double Track The selected technique constructed by Keller accelerated the contractor’s schedule four weeks by replacing compaction grouting with rigid inclusions. San Diego…
/projects/san-diego-river-bridge-double-track
Northern Arizona University Campus Hub
Project
Northern Arizona University Campus Hub Keller provided an alternate ground improvement solution, saving significant cost and time over the conventional deep foundation system originally considered.…
/projects/northern-arizona-university-campus-hub
Markets
Landing page
Markets Coal Combustion Residuals (CCR) New and existing impoundments, geotechnical enhancements, water management, and more. New and existing impoundments, geotechnical enhancements, water…
/expertise/markets
Miami Children's Hospital
Project
Miami Children's Hospital During the construction of the Miami Children's Hospital, Keller used multiple techniques while controlling construction disturbance to hospital operations, staff…
/projects/miami-childrens-hospital
Preferred Freezer Warehouse
Project
Preferred Freezer Warehouse Rigid inclusions installed by Keller successfully supported foundations and heavy slab loads to avoid the use of deep foundations, structural slabs, and removal of…
/projects/preferred-freezer-warehouse
Thornton Tunnel Grouting
Project
Thornton Tunnel Grouting Keller’s tunnel grouting ensured continuity of the grout curtain around the 7.8 Billion Gallon CSO (combined sewage overflow) storage reservoir. Thornton Tunnel Grouting The…
/projects/thornton-tunnel-grouting
Thornton Composite Reservoir
Project
Thornton Composite Reservoir Keller constructed a low permeability grout curtain surrounding the CSO (combined sewer overflow) reservoir to protect the surrounding groundwater. Thornton Composite…
/projects/thornton-composite-reservoir
Lake Manatee Dam
Project
Lake Manatee Dam Keller accelerated construction to complete treatment of critical sections before the impending hurricane season with potentially catastrophic high-water loading. Lake Manatee Dam…
/projects/lake-manatee-dam
Heap Leach Drainage
Project
Heap Leach Drainage In the year following the wick drain installation by Keller, copper production increased significantly at the mine. Heap Leach Drainage The project A copper mine in Safford, AZ…
/projects/heap-leach-drainage
Irving-Toyota Music Factory
Project
Irving-Toyota Music Factory Keller's use of a water injection system significantly reduced the cost to the owner and allowed the project to be completed a month ahead of schedule. Irving-Toyota…
/projects/irving-toyota-music-factory
Suncor Pond 5
Project
Suncor Pond 5 Keller developed equipment and procedures enabling the safe installation of the drainage system from on top of a floating coke cap working platform. Suncor Pond 5 Aerial view of Pond 5…
/projects/suncor-pond-5
San Luis Rey Water Reclamation Facility
Project
San Luis Rey Water Reclamation Facility Keller completed construction ahead of the owner’s schedule and assured quality with nine post-construction Cone Penetration Tests (CPT). San Luis Rey Water…
/projects/san-luis-rey-water-reclamation-facility
Volcan Mountain Transmission Poles
Project
Volcan Mountain Transmission Poles Keller designed and constructed a permanent guy wire anchor solution, putting an end to the owner’s two-year-long endeavor to stabilize overturning transmission…
/projects/volcan-mountain-transmission-poles
Infrastructure
Market
Infrastructure Keller is actively involved in efforts to upgrade infrastructure throughout North America. We provide geotechnical solutions for each unique project, whether it is transportation,…
/expertise/markets/infrastructure
Sharp Chula Vista Ocean View Tower
Project
Sharp Chula Vista Ocean View Tower Keller completed the design-build Office of Statewide Health Planning and Development (OSHPD) project to treat in-situ existing fill soil that was deemed…
/projects/sharp-chula-vista-ocean-view-tower
Coldwater Sanitary Relief Storage Tank C
Project
Coldwater Sanitary Relief Storage Tank C Keller reduced the total foundation cost using a combination of wick drains and surcharging to eliminate down-drag on the pile foundation system and reduced…
/projects/coldwater-sanitary-relief-storage-tank-c
Marana Water Reclamation Facility Expansion
Project
Marana Water Reclamation Facility Expansion Keller's ground improvement program was completed 1.5 weeks ahead of the contracted schedule. Marana Water Reclamation Facility Expansion The vibro…
/projects/marana-water-reclamation-facility
Marco Island Executive Airport
Project
Marco Island Executive Airport  Keller provided a design-build ground improvement solution to support the construction of the new airport. Marco Island Executive Airport An aerial view of the Marco…
/projects/marco-island-executive-airport

Pagination

  • Previous page ‹‹
  • Page 8
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe