Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (835)
  • Project (339)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (53)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
Whiting Refinery Modernization
Project
Whiting Refinery Modernization Keller performed this $80 million project, within the active units of an operating oil refinery. Whiting Refinery Modernization The project BP’s ‘Operation Canadian…
/projects/whiting-refinery-modernization
Block 37
Project
Block 37 Keller met the challenges of this complex and fast-tracked project utilizing drilled shaft, slurry, and secant wall techniques. Block 37 The project Block 37 was to be repurposed as a…
/projects/block-37
Avens Bridge - South Holston Lake
Project
Avens Bridge - South Holston Lake Keller's innovative redesign of the floating platform helped overcome low water conditions. Avens Bridge - South Holston Lake The project Avens Bridge sees some…
/projects/avens-bridge-south-holston-lake
Expertise
Landing page
Expertise Techniques Keller offers a market-leading portfolio of techniques such as micropiles, ground freezing, auger cast piles, and more. Keller offers a market-leading portfolio of techniques…
/expertise
ATI Hot-Rolling and Processing Facility
Project
ATI Hot-Rolling and Processing Facility Keller constructed a water-tight secant retaining structure for the ATI Hot-Rolling and Processing Facility. ATI Hot-Rolling and Processing Facility 128 secant…
/projects/ati-hot-rolling-and-processing-facility
New Jersey High-Speed Rail Improvement
Project
New Jersey High-Speed Rail Improvement Keller performed construction in an active electrified railroad environment using specialized high rail and low overhead drill equipment. New Jersey High-Speed…
/projects/new-jersey-high-speed-rail-improvement
200 North Michigan Avenue
Project
200 North Michigan Avenue Keller protected existing adjacent structures' foundations while drilling at several locations containing existing timber piles. 200 North Michigan Avenue drilled…
/projects/200-north-michigan-avenue
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation
Project
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation Keller installed jet grout columns to provide structural support to the failing Brooklyn Marine Terminal 8 bulkhead. Brooklyn Marine Terminal 8…
/projects/brooklyn-marine-terminal-8
Hart Street Wastewater Pump Station Force Main Replacement
Project
Hart Street Wastewater Pump Station Force Main Replacement Jet grouted columns provide soil stabilization and support to piers piles, bearing 500-ton crane loads, during the construction of twin 48-…
/projects/hart-street-wwps
Download
https://youtu.be/tH5uVBMoz1I
Robinson Landing project video
Resource
Robinson Landing project video Constructing the TRD wall at Robinson Landing. Video Despite the challenges of working on the Potomac River adjacent to historic buildings and the discovery of an old…
/node/3246
26th Street Emergency Repairs
Project
26th Street Emergency Repairs Our team responded to the emergency quickly and began work within days of the collapse. We found the optimal solution that reduced impact to the surrounding neighborhood…
/projects/26th-street-emergency-repairs
San Diego River Bridge Double Track
Project
San Diego River Bridge Double Track The selected technique constructed by Keller accelerated the contractor’s schedule four weeks by replacing compaction grouting with rigid inclusions. San Diego…
/projects/san-diego-river-bridge-double-track
Northern Arizona University Campus Hub
Project
Northern Arizona University Campus Hub Keller provided an alternate ground improvement solution, saving significant cost and time over the conventional deep foundation system originally considered.…
/projects/northern-arizona-university-campus-hub
Markets
Landing page
Markets Coal Combustion Residuals (CCR) New and existing impoundments, geotechnical enhancements, water management, and more. New and existing impoundments, geotechnical enhancements, water…
/expertise/markets
Miami Children's Hospital
Project
Miami Children's Hospital During the construction of the Miami Children's Hospital, Keller used multiple techniques while controlling construction disturbance to hospital operations, staff…
/projects/miami-childrens-hospital
Preferred Freezer Warehouse
Project
Preferred Freezer Warehouse Rigid inclusions installed by Keller successfully supported foundations and heavy slab loads to avoid the use of deep foundations, structural slabs, and removal of…
/projects/preferred-freezer-warehouse
Thornton Tunnel Grouting
Project
Thornton Tunnel Grouting Keller’s tunnel grouting ensured continuity of the grout curtain around the 7.8 Billion Gallon CSO (combined sewage overflow) storage reservoir. Thornton Tunnel Grouting The…
/projects/thornton-tunnel-grouting
Thornton Composite Reservoir
Project
Thornton Composite Reservoir Keller constructed a low permeability grout curtain surrounding the CSO (combined sewer overflow) reservoir to protect the surrounding groundwater. Thornton Composite…
/projects/thornton-composite-reservoir
Lake Manatee Dam
Project
Lake Manatee Dam Keller accelerated construction to complete treatment of critical sections before the impending hurricane season with potentially catastrophic high-water loading. Lake Manatee Dam…
/projects/lake-manatee-dam
Heap Leach Drainage
Project
Heap Leach Drainage In the year following the wick drain installation by Keller, copper production increased significantly at the mine. Heap Leach Drainage The project A copper mine in Safford, AZ…
/projects/heap-leach-drainage

Pagination

  • Previous page ‹‹
  • Page 8
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe