Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Wickiup Dam
Project
Wickiup Dam Wickiup Dam was built on materials that were likely to liquefy in the event of an earthquake. Keller was able to stabilize the soil in place to prevent this occurrence. Wickiup Dam…
/projects/wickiup-dam
Liquified Natural Gas Manufacturing Facility
Project
Liquified Natural Gas Manufacturing Facility Phosphate contamination of the groundwater beneath a proposed LNG equipment manufacturing facility required groundwater control. A vibrated beam slurry…
/projects/lng-manufacturing-facility
Michigan State University Spartan Stadium Expansion
Project
Michigan State University Spartan Stadium Expansion Expansion and renovation of the historic Michigan State Spartan football stadium required foundation underpinning. Limited information about the…
/projects/spartan-stadium-expansion
Distribution Facility Expansion
Project
Distribution Facility Expansion A state-of-the-art, 1.4 million square foot distribution facility was to be constructed in Memphis, Tennessee. Ground improvement was used to treat the very poor,…
/projects/distribution-facility-expansion
1600 Museum Park
Project
1600 Museum Park Despite neighboring properties consisting of a commuter railroad, townhouses, and an electrical substation, Keller installed an earth retention system to support a 32-story…
/projects/1600-museum-park
Northwest School
Project
Northwest School Modernization of the historic Northwest School required tight access earth retention and shoring from inside of the existing structure. Northwest School Interior renovations and a…
/projects/northwest-school
Faraday Launching Tunnel Shaft
Project
Faraday Launching Tunnel Shaft During shaft construction, water and soil inflow resulted in a sinkhole at the surface. Keller repaired the leak using jet grouting and densified the loosened soils…
/projects/faraday-launching-tunnel-shaft
Lexington Landslide
Project
Lexington Landslide The Lexington Landslide required quick action and flexibility to save the luxury apartment complexes at the bottom of the slide from destruction. Lexington Landslide completed…
/projects/lexington-landslide
Yucca Loma Bridge
Project
Yucca Loma Bridge Yucca Loma Bridge over the Mojave River was constructed to relieve traffic congestion in Los Angeles. Bridge foundations required drilling through difficult subsurface conditions.…
/projects/yucca-loma-bridge
BNSF Bridge Sherman
Project
BNSF Bridge Sherman Critical releveling work needed to be done on the BNSF Bridge Sherman to ensure the safety of passing trains and passengers. Work was completed with minimal disruption to the…
/projects/bnsf-bridge-sherman
Government and defense
Market
Government and defense Keller's extensive experience working with the US government and defense makes us aware of the unique requirements of these projects. Police department Filling the stone…
/expertise/markets/institutional/government-defense
Schoharie County Office Complex
Project
Schoharie County Office Complex A cutoff wall was constructed to reduce the impact of flooding to the Schoharie County Office Complex. The office serves as the Courthouse, DMV, and County Office…
/projects/schoharie-county-office-complex
Burton Family Football Complex
Project
Burton Family Football Complex A new football complex was slated for construction on the UConn Storrs campus. Ground improvement was chosen to meet the off-season construction schedule. Burton Family…
/projects/burton-family-football-complex
Walmart SuperCenter
Project
Walmart SuperCenter Keller designed and installed an earthquake drain system to mitigate liquefaction concerns for a new Walmart SuperCenter. Walmart SuperCenter earthquake drains Installing wick…
/projects/walmart-supercenter
Calumet Water Reclamation Plant
Project
Calumet Water Reclamation Plant A temporary earth retention system was installed to support the excavation needed to construct a new wastewater pump station at the Calumet Water Reclamation Plant.…
/projects/calumet-water-reclamation-plant
Four Corners CCR Impoundment
Project
Four Corners CCR Impoundment Four Corners Generating Station needed to increase the capacity of its CCR impoundment for a number of reasons. Keller installed wick drains to provide the necessary…
/projects/four-corners-ccr-impoundment
Elliott Bay Seawall Replacement
Project
Elliott Bay Seawall Replacement The Elliott Bay Seawall Replacement was one of the largest global jet grouting projects performed. Elliott Bay Seawall The project To improve seismic safety,…
/projects/elliott-bay-seawall-replacement
American Honda Office and Warehouse
Project
American Honda Office and Warehouse The 20,000 square foot treatment area of the American Honda Office and Warehouse was stabilized while keeping it fully operational. American Honda Office and…
/projects/american-honda-office-and-warehouse
Blessing Hospital – Patient Tower Addition
Project
Blessing Hospital – Patient Tower Addition Blessing Hospital required support during an adjacent deep excavation for the addition of a new Patient Tower. Blessing Hospital The project Working on a…
/projects/blessing-hospital-patient-tower-addition
Colton Crossing
Project
Colton Crossing The Colton Crossing project allowed for grade separation between Union Pacific and BNSF. Keller designed and installed ground improvement to support the new fill walls. Colton…
/projects/colton-crossing
Pagination
Previous page
‹‹
Page 5
Next page
››