Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Logistics Park Intermodal Facility
Project
Logistics Park Intermodal Facility Keller's emergency response micropile solution was successfully completed within a very limited window, allowing resumption of full facility operations almost…
/projects/logistics-park-intermodal-facility
Verizon Switch Building Expansion
Project
Verizon Switch Building Expansion Keller's established local presence and in-depth knowledge of the prevailing subsurface conditions offered the client assurance of an efficient and cost-…
/projects/verizon-switch-building-expansion
US Customs House
Project
US Customs House Keller’s design-build micropile solution, installed in tight access within a historic structure, helped preserve an important part of history within the project schedule and budget.…
/projects/us-customs-house
Historic Public School
Project
Historic Public School Keller provided a design-build underpinning solution and was able to quickly adapt the design and construction methods to address multiple changed conditions. Historic Public…
/projects/historic-public-school
Jack Unit II STG Foundation
Project
Jack Unit II STG Foundation Keller successfully mitigated the ongoing settlement of the foundation slab of a critical generator unit during peak summer demand without interrupting normal facility…
/projects/jack-unit-ii-stg-foundation
East Roseville Viaduct Widening
Project
East Roseville Viaduct Widening Keller successfully completed the drilled shaft installation five weeks ahead of schedule with no safety incidents despite adverse site logistics. East Roseville…
/projects/east-roseville-viaduct-widening
SELA Urban Flood Control
Project
SELA Urban Flood Control Keller's consistency and focus, careful attention to safety protocols, equipment staging, and operational procedures throughout a four-year scope of work mitigated…
/projects/sela-urban-flood-control
Los Vientos Wind Farm
Project
Los Vientos Wind Farm Keller’s production rate was 33% faster than anticipated, effectively shaving six weeks off the ground improvement project schedule. Los Vientos Wind Farm Construction of spread…
/projects/los-vientos-wind-farm
Pala Casino Parking Structure Expansion
Project
Pala Casino Parking Structure Expansion Keller successfully completed the micropile installation two weeks ahead of schedule, allowing the main contractor early access to begin the next phase of the…
/projects/pala-casino-parking-structure-expansion
Philistine Rondo Elementary School
Project
Philistine Rondo Elementary School Keller completed the ground improvement program 2.5 weeks ahead of the main contractor’s anticipated 13-week schedule. Philistine Rondo Elementary School vibro…
/projects/philistine-rondo-elementary-school
Society Hill Apartments
Project
Society Hill Apartments Keller's alternate vibro concrete column proposal alleviated concerns regarding contaminated groundwater percolating up through the originally proposed timber pile…
/projects/society-hill-apartments
Elkhorn Valley Ethanol
Project
Elkhorn Valley Ethanol Keller provided a cost-effective vibro concrete columns design to overcome constructability concerns (necking) within the soft soils. Elkhorn Valley Ethanol The project Elkhorn…
/projects/elkhorn-valley-ethanol
Titan’s Practice Facility Sidewalk
Project
Titan’s Practice Facility Sidewalk Keller finalized the design, safely circumvented utility lines beneath the sidewalk alignment, and completed the foundation support in just four days, including…
/projects/titans-practice-facility-sidewalk
Sunrise Hospital and Medical Center
Project
Sunrise Hospital and Medical Center Keller was able to save two weeks on the unexpectedly fast-track deep foundation schedule by mobilizing a second drill rig to install drilled shafts. Sunrise…
/projects/sunrise-hospital-and-medical-center
Portageville Bridge
Project
Portageville Bridge Despite access challenges in the variable terrain and drilling depths greater than expected due to peaks and valleys in the rock, Keller completed work three weeks ahead of…
/projects/portageville-bridge
Biomedical Research Center
Project
Biomedical Research Center Keller offered a value-engineered alternative to the original earth support design, which saved the client time and money on the tight construction schedule. Biomedical…
/projects/biomedical-research-center
Mercedes-Benz Stadium
Project
Mercedes-Benz Stadium Keller offered an accelerated schedule and worked 10 to 12-hours, six days a week to complete the project within five weeks of mobilization. Mercedes-Benz Stadium The project…
/projects/mercedes-benz-stadium
Flagship Retail Store
Project
Flagship Retail Store Keller’s optimized foundation design resulted in the most cost-effective solution while also allowing differing pile operations to run concurrently, streamlining the foundation…
/projects/flagship-retail-store
Seaside Way Pedestrian Bridge
Project
Seaside Way Pedestrian Bridge Keller completed the project safely and on time despite limited work areas in this congested, high-traffic location. This project received ENR's 'Best of the…
/projects/seaside-way-pedestrian-bridge
Fulfillment Center
Project
Fulfillment Center Keller’s operational excellence resulted in the completion of the ground improvement program a week ahead of the general contractor’s proposed schedule. Fulfillment Center…
/projects/fulfillment-center
Pagination
Previous page
‹‹
Page 14
Next page
››