Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
River District
Project
River District Keller overcame difficult ground conditions to complete work safely within the client's compressed schedule. River District The project Vancouver has steadily increased in…
/projects/river-district
The Shore
Project
The Shore Keller conducted a ground improvement solution for The Shore, a new mixed-use structure. The Shore vibro replacement The project Rise Commercial Developments planned a new 6-storey mixed-…
/projects/shore
Port Coquitlam Recreation Centre
Project
Port Coquitlam Recreation Centre Keller installed driven piles for the phased Port Coquitlam (PoCo) Recreation Centre to complete the scope of work safely and efficiently. Port Coquitlam Recreation…
/projects/port-coquitlam-recreation-centre
Aragon Development Complex
Project
Aragon Development Complex Keller successfully completed their first cutter soil mixing (CSM) project in Canada one week ahead of schedule. Aragon Development Complex crew The crew that worked on…
/projects/aragon-development-complex
17th Street Canal Floodwall Remediation
Project
17th Street Canal Floodwall Remediation Keller used two triple axis jet grouting machines that were able to do the entire contract 33% faster than the anticipated schedule, resulting in a project…
/projects/17th-street-canal-floodwall-remediation
Transit City Condominiums
Project
Transit City Condominiums Keller completed the first large-scale polymer slurry drilled shaft project in Ontario using a slurry tank farm. Transit City Condominiums An aerial view of the planned…
/projects/transit-city-condominiums
Calgary Zoo
Project
Calgary Zoo Keller worked under an aggressive schedule, resulting in a 50% reduction in time needed for the sheet piling installation. Calgary Zoo The project The Calgary Zoo suffered more than $50…
/projects/calgary-zoo
River District - Phase 2
Project
River District - Phase 2 Keller completed the project ahead of schedule by utilizing two vibro replacement rigs simultaneously in an excavation just above the water table. River District - Phase 2 An…
/projects/river-district-phase-2
Blackfalds Lift Station
Project
Blackfalds Lift Station Keller provided a design-build solution of a circular secant pile wall to retain earth and aid excavation. Blackfalds Lift Station secant piles Installing the cicular secant…
/projects/blackfalds-lift-station
Fairtree Sewage Pumping Station
Project
Fairtree Sewage Pumping Station Keller mobilized and completed soilcrete block installation within one week to stabilize wet silty sand and allow a utility tie-in to be constructed between two shafts…
/projects/fairtree-sewage-pumping-station
Syncrude Raw Water Intake System
Project
Syncrude Raw Water Intake System Keller completed a challenging scope of anchor and sheet pile work requiring multiple rigs in a small footprint within a restricted schedule. Syncrude Raw Water…
/projects/syncrude-raw-water-intake-system
Sunridge Mall
Project
Sunridge Mall Keller completed the project ahead of schedule with an excellent safety record. Sunridge Mall The completed drilled shafts with steel reinforcements and galvanized beams. The project…
/projects/sunridge-mall
Red Rock Hydroelectric
Project
Red Rock Hydroelectric Slurry walls addressed multiple design and dam safety aspects on this challenging project. Red Rock Hydroelectric The project The Red Rock Hydroelectric Project, located at the…
/projects/red-rock-hydroelectric
The Paramount
Project
The Paramount Keller completed wall construction ahead of the client’s aggressive schedule. The Paramount The project The Paramount is a new luxury development in downtown Richmond with 540 studio…
/projects/paramount
Ritz-Carlton Residences
Project
Ritz-Carlton Residences Keller successfully completed the auger cast pile installation and service elevator pit excavation bottom seal on time and on budget. Ritz-Carlton Residences An aerial of the…
/projects/ritz-carlton-residences
Oceana Bal Harbour
Project
Oceana Bal Harbour Keller provided the client with an on-time turnkey solution for a deep, large area excavation adjacent to the ocean with design-build excavation support, groundwater control, and…
/projects/oceana-bal-harbour
2nd Avenue Subway
Project
2nd Avenue Subway Keller safely constructed a deep support of excavation system on both sides of a busy active New York City street. 2nd Avenue Subway Installing secant piles at the 2nd Avenue Subway…
/projects/2nd-avenue-subway
Wrigley Field
Project
Wrigley Field Built in 1913, the baseball park is home to the Chicago Cubs. Keller delivered a multi-technique solution to support recent upgrades while preserving this iconic, historic structure.…
/projects/wrigley-field
Globe Life Field
Project
Globe Life Field At over 253,000 ft 2 (total area), Keller's soil nail wall is believed to be the largest single permanent soil nail wall in North America. Globe Life Field The project The Texas…
/projects/globe-life-field
Remuda Elementary School
Project
Remuda Elementary School In areas where the potential for seismic activity is an important consideration for new construction, Keller’s experience coupled with a range of ground improvement options…
/projects/remuda-elementary-school
Pagination
Previous page
‹‹
Page 10
Next page
››