Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (837)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
River District
Project
River District Keller overcame difficult ground conditions to complete work safely within the client's compressed schedule. River District The project Vancouver has steadily increased in…
/projects/river-district
The Shore
Project
The Shore Keller conducted a ground improvement solution for The Shore, a new mixed-use structure. The Shore vibro replacement The project Rise Commercial Developments planned a new 6-storey mixed-…
/projects/shore
Port Coquitlam Recreation Centre
Project
Port Coquitlam Recreation Centre Keller installed driven piles for the phased Port Coquitlam (PoCo) Recreation Centre to complete the scope of work safely and efficiently. Port Coquitlam Recreation…
/projects/port-coquitlam-recreation-centre
Aragon Development Complex
Project
Aragon Development Complex Keller successfully completed their first cutter soil mixing (CSM) project in Canada one week ahead of schedule. Aragon Development Complex crew The crew that worked on…
/projects/aragon-development-complex
17th Street Canal Floodwall Remediation
Project
17th Street Canal Floodwall Remediation Keller used two triple axis jet grouting machines that were able to do the entire contract 33% faster than the anticipated schedule, resulting in a project…
/projects/17th-street-canal-floodwall-remediation
Transit City Condominiums
Project
Transit City Condominiums Keller completed the first large-scale polymer slurry drilled shaft project in Ontario using a slurry tank farm. Transit City Condominiums An aerial view of the planned…
/projects/transit-city-condominiums
Calgary Zoo
Project
Calgary Zoo Keller worked under an aggressive schedule, resulting in a 50% reduction in time needed for the sheet piling installation. Calgary Zoo The project The Calgary Zoo suffered more than $50…
/projects/calgary-zoo
River District - Phase 2
Project
River District - Phase 2 Keller completed the project ahead of schedule by utilizing two vibro replacement rigs simultaneously in an excavation just above the water table. River District - Phase 2 An…
/projects/river-district-phase-2
Blackfalds Lift Station
Project
Blackfalds Lift Station Keller provided a design-build solution of a circular secant pile wall to retain earth and aid excavation. Blackfalds Lift Station secant piles Installing the cicular secant…
/projects/blackfalds-lift-station
Fairtree Sewage Pumping Station
Project
Fairtree Sewage Pumping Station Keller mobilized and completed soilcrete block installation within one week to stabilize wet silty sand and allow a utility tie-in to be constructed between two shafts…
/projects/fairtree-sewage-pumping-station
Syncrude Raw Water Intake System
Project
Syncrude Raw Water Intake System Keller completed a challenging scope of anchor and sheet pile work requiring multiple rigs in a small footprint within a restricted schedule. Syncrude Raw Water…
/projects/syncrude-raw-water-intake-system
Sunridge Mall
Project
Sunridge Mall Keller completed the project ahead of schedule with an excellent safety record. Sunridge Mall The completed drilled shafts with steel reinforcements and galvanized beams. The project…
/projects/sunridge-mall
Red Rock Hydroelectric
Project
Red Rock Hydroelectric Slurry walls addressed multiple design and dam safety aspects on this challenging project. Red Rock Hydroelectric The project The Red Rock Hydroelectric Project, located at the…
/projects/red-rock-hydroelectric
The Paramount
Project
The Paramount Keller completed wall construction ahead of the client’s aggressive schedule. The Paramount The project The Paramount is a new luxury development in downtown Richmond with 540 studio…
/projects/paramount
Ritz-Carlton Residences
Project
Ritz-Carlton Residences Keller successfully completed the auger cast pile installation and service elevator pit excavation bottom seal on time and on budget. Ritz-Carlton Residences An aerial of the…
/projects/ritz-carlton-residences
Oceana Bal Harbour
Project
Oceana Bal Harbour Keller provided the client with an on-time turnkey solution for a deep, large area excavation adjacent to the ocean with design-build excavation support, groundwater control, and…
/projects/oceana-bal-harbour
2nd Avenue Subway
Project
2nd Avenue Subway Keller safely constructed a deep support of excavation system on both sides of a busy active New York City street. 2nd Avenue Subway Installing secant piles at the 2nd Avenue Subway…
/projects/2nd-avenue-subway
Wrigley Field
Project
Wrigley Field Built in 1913, the baseball park is home to the Chicago Cubs. Keller delivered a multi-technique solution to support recent upgrades while preserving this iconic, historic structure.…
/projects/wrigley-field
Globe Life Field
Project
Globe Life Field At over 253,000 ft 2 (total area), Keller's soil nail wall is believed to be the largest single permanent soil nail wall in North America. Globe Life Field The project The Texas…
/projects/globe-life-field
Remuda Elementary School
Project
Remuda Elementary School In areas where the potential for seismic activity is an important consideration for new construction, Keller’s experience coupled with a range of ground improvement options…
/projects/remuda-elementary-school

Pagination

  • Previous page ‹‹
  • Page 10
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe