Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Tremie bottom seals
Technique
Tremie bottom seals Keller installs either tremie seals or soil mixing underneath water basements and structures. We cater to the most cost-effective alternative for our clients. Tremie bottom seals…
/expertise/techniques/tremie-bottom-seals
Keller ranks #1 on 2019 ENR list
News article
Keller ranks #1 on 2019 ENR list News article category Workplace and people Engineering News-Record (ENR) ranks Keller #1 Excavation and Foundation firm for 2019. This top position has been held by…
/news/keller-ranks-1-2019-enr-list
4th Street Underpass
Project
4th Street Underpass Keller designed and constructed temporary shoring to support temporary railroad relocation (shoo-fly lines). 4th Street Underpass The project As part of Calgary’s effort to…
/projects/4th-street-underpass
15 Mile Road Sewer Repair
Project
15 Mile Road Sewer Repair Mobilization of multiple Keller crews for the emergency response stabilization work began within one working day of the initial site visit. 15 mile road low mobility…
/projects/15-mile-road-sewer-repair
University of Georgia Sanford Stadium
Project
University of Georgia Sanford Stadium Keller successfully completed low headroom auger cast piles on time and on budget while working around an aggressive, restricted college football schedule.…
/projects/university-georgia-sanford-stadium
Hard Rock Casino Tunnel
Project
Hard Rock Casino Tunnel Over the course of a year, Keller exceeded the client’s expectations by consistently completing all aspects of the work ahead of schedule. Hard Rock Casino Tunnel The project…
/projects/hard-rock-casino-tunnel
Texas Solar Facility
Project
Texas Solar Facility Keller installed over 30,000 driven piles to support this Solar Facility's solar panel and racking system. Texas Solar Facility solar panels The project Located just north…
/projects/texas-solar-facility
Caulks Creek
Project
Caulks Creek Keller's design of hydraulically pressed sheet piles with a jet grout bottom seal eliminated concern over vibrations damaging existing utilities and reduced groundwater infiltration…
/projects/caulks-creek
Division I Diversion Structure
Project
Division I Diversion Structure Keller performed the jet grouting work in a sensitive and congested environment without impacting or damaging numerous existing active utilities. Division I Diversion…
/projects/division-i-diversion-structure
Saint Louis University Hospital Renewal
Project
Saint Louis University Hospital Renewal Keller addressed highly variable subsurface conditions by tailoring each earth support method, providing the client with the most cost-effective solution while…
/projects/saint-louis-university-hospital-renewal
Annunciation Church
Project
Annunciation Church Keller used techniques previously used for historic structures and real-time monitoring to communicate positive results to the Diocese and maintain the integrity of the historic…
/projects/annunciation-church
Rail Car Assembly Facility
Project
Rail Car Assembly Facility Keller’s efficient and effective completion of the ground improvement work allowed for new foundation construction earlier than anticipated. Rail Car Assembly Facility…
/projects/rail-car-assembly-facility
Grand Valley State University Expansion
Project
Grand Valley State University Expansion Despite adverse winter weather conditions, Keller completed the vibro compaction work on time and within budget. Grand Valley State University Expansion…
/projects/grand-valley-state-university-expansion
Rolling Hills Wind Farm
Project
Rolling Hills Wind Farm Keller’s ability to assemble experienced personnel and resources in-house to perform all techniques under one turnkey contract streamlined the overall ground improvement/…
/projects/rolling-hills-wind-farm
LNG Steelton Facility Fuel Tank
Project
LNG Steelton Facility Fuel Tank Keller's ground improvement solution allowed the tank to economically meet American Petroleum Institute (API) settlement criteria without bringing contaminated…
/projects/lng-steelton-facility-fuel-tank
Houston Fuel Oil Crude Expansion
Project
Houston Fuel Oil Crude Expansion Keller successfully stabilized the tanks without disconnecting and reconnecting the appurtenances (nozzles, ladders, etc.), saving the owner time and effort. Houston…
/projects/houston-fuel-oil-crude-expansion
Conan Terminal Tanks
Project
Conan Terminal Tanks Keller's redesign of the tank foundation system resulted in project completion one week ahead of schedule and considerable cost savings for the client. Conan Terminal Tanks…
/projects/conan-terminal-tanks
Millennium Tower
Project
Millennium Tower Keller's design-build hybrid earth retention system provided a value-engineered solution that reduced the project schedule, minimized movement of the adjacent soil, and…
/projects/millennium-tower
Huckleberry Creek Reservoir
Project
Huckleberry Creek Reservoir Keller developed a grouting solution that was presented to the owner within seven days of the initial site visit and successfully mitigated the leak in the dam through an…
/projects/huckleberry-creek-reservoir
One Manhattan Square
Project
One Manhattan Square Keller's value-engineered macropile alternative to the originally-specified drilled shafts significantly streamlined the overall foundation schedule. One Manhattan Square…
/projects/one-manhattan-square
Pagination
Previous page
‹‹
Page 13
Next page
››