Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Irving-Toyota Music Factory
Project
Irving-Toyota Music Factory Keller's use of a water injection system significantly reduced the cost to the owner and allowed the project to be completed a month ahead of schedule. Irving-Toyota…
/projects/irving-toyota-music-factory
Suncor Pond 5
Project
Suncor Pond 5 Keller developed equipment and procedures enabling the safe installation of the drainage system from on top of a floating coke cap working platform. Suncor Pond 5 Aerial view of Pond 5…
/projects/suncor-pond-5
San Luis Rey Water Reclamation Facility
Project
San Luis Rey Water Reclamation Facility Keller completed construction ahead of the owner’s schedule and assured quality with nine post-construction Cone Penetration Tests (CPT). San Luis Rey Water…
/projects/san-luis-rey-water-reclamation-facility
Volcan Mountain Transmission Poles
Project
Volcan Mountain Transmission Poles Keller designed and constructed a permanent guy wire anchor solution, putting an end to the owner’s two-year-long endeavor to stabilize overturning transmission…
/projects/volcan-mountain-transmission-poles
Infrastructure
Market
Infrastructure Keller is actively involved in efforts to upgrade infrastructure throughout North America. We provide geotechnical solutions for each unique project, whether it is transportation,…
/expertise/markets/infrastructure
Sharp Chula Vista Ocean View Tower
Project
Sharp Chula Vista Ocean View Tower Keller completed the design-build Office of Statewide Health Planning and Development (OSHPD) project to treat in-situ existing fill soil that was deemed…
/projects/sharp-chula-vista-ocean-view-tower
Coldwater Sanitary Relief Storage Tank C
Project
Coldwater Sanitary Relief Storage Tank C Keller reduced the total foundation cost using a combination of wick drains and surcharging to eliminate down-drag on the pile foundation system and reduced…
/projects/coldwater-sanitary-relief-storage-tank-c
Marana Water Reclamation Facility Expansion
Project
Marana Water Reclamation Facility Expansion Keller's ground improvement program was completed 1.5 weeks ahead of the contracted schedule. Marana Water Reclamation Facility Expansion The vibro…
/projects/marana-water-reclamation-facility
Marco Island Executive Airport
Project
Marco Island Executive Airport Keller provided a design-build ground improvement solution to support the construction of the new airport. Marco Island Executive Airport An aerial view of the Marco…
/projects/marco-island-executive-airport
St. Vrain Mill
Project
St. Vrain Mill Keller conducted the structural and geotechnical remediation program using limited access equipment with no major distress to the historic property and its structures. St. Vrain Mill…
/projects/st-vrain-mill
Seaworld Electric Eel
Project
Seaworld Electric Eel Keller completed the construction of the Electric Eel roller coaster foundations a week ahead of schedule and without causing harm to adjacent sensitive exhibits. Seaworld…
/projects/seaworld-electric-eel
Failing Block Wall
Project
Failing Block Wall Keller provided a design-build solution to quickly and economically repair a failing block wall and stabilize the store while allowing the facility to remain operational. Failing…
/projects/failing-block-wall
Tunnel Maintenance Contract
Project
Tunnel Maintenance Contract Keller has developed customized grout mixes and methodologies tailored to the subsurface conditions and groundwater source to successfully limit infiltration into the…
/projects/tunnel-maintenance-contract
Scottsdale Fashion Square
Project
Scottsdale Fashion Square Keller's innovative design and quick mobilization allowed the project to be completed three weeks ahead of schedule while safely working near an active mall entrance in…
/projects/scottsdale-fashion-square
Baptist Memorial Hospital – Crittenden
Project
Baptist Memorial Hospital – Crittenden Keller combined vibro piers with earthquake drains (EQDs) for a cost-effective alternative to applying deep foundations solutions. Baptist Memorial Hospital…
/projects/baptist-memorial-hospital-crittenden
Atlantic Wood Superfund Site
Project
Atlantic Wood Superfund Site Keller assisted the client in identifying an economical approach to produce a safe working platform for the equipment while minimizing the impact on the schedule. Keller…
/projects/atlantic-wood-superfund-site
Generator Pad Addition
Project
Generator Pad Addition Keller’s design-build approach delivered the most cost- and schedule-effective ground improvement solution to satisfy the static and seismic requirements of the project.…
/projects/generator-pad-addition
Lees Former Impoundment
Project
Lees Former Impoundment Keller finished the work for the project two weeks ahead of the owner’s overall 13-week schedule. Lees Former Impoundment The project The two-acre site contains an old…
/projects/lees-former-impoundment
MSU Regency Athletic Complex
Project
MSU Regency Athletic Complex As an alternative to the originally proposed removal and replacement program, Keller performed dynamic compaction to improve the density of the fill material and provide…
/projects/msu-regency-athletic-complex
LACMTA Regional Connector Subway
Project
LACMTA Regional Connector Subway Keller offered an alternate remote horizontal directional drilling (HDD) plan to the specified compensation grout pipe installation approach, reducing the number of…
/projects/lacmta-regional-connector-subway
Pagination
Previous page
‹‹
Page 9
Next page
››