Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Edwardsport Integrated Gasification Combined Cycle
Project
Edwardsport Integrated Gasification Combined Cycle Keller's extensive load test program provided actual in-situ design values, which ultimately allowed for the most efficient, cost-effective…
/projects/edwardsport-igcc
Deep Rock Tunnel Connector
Project
Deep Rock Tunnel Connector Keller completed construction of the tunnel nearby to downtown Indianapolis, so crews worked successfully within extremely small footprints. Deep Rock Tunnel Connector The…
/projects/deep-rock-tunnel-connector
DC United Soccer Stadium
Project
DC United Soccer Stadium Keller completed the work within an aggressive schedule for design and installation to meet the overall project schedule. DC United Soccer Stadium The project A new 20,000-…
/projects/dc-united-soccer-stadium
CSX Creek Bridge Replacements
Project
CSX Creek Bridge Replacements Keller performed this dual bridge project using percussion rock drills and conventional rock removal methods. CSX Creek Bridge Replacements The project The CSX…
/projects/csx-creek-bridge-replacements
Cleveland Convention Center and Hotel
Project
Cleveland Convention Center and Hotel Keller experimented and succeeded in using a large-scale European hydraulic drill rig to install deep rock socketed caissons with heavy, full-length permanent…
/projects/cleveland-convention-center-and-hotel
Burlington Camden Reliability Project
Project
Burlington Camden Reliability Project Keller installed several drilled shafts with a custom-built, low clearance rig with a drill attachment in order to clear the 45-foot height limitation.…
/projects/burlington-camden-reliability-project
Whiting Refinery Modernization
Project
Whiting Refinery Modernization Keller performed this $80 million project, within the active units of an operating oil refinery. Whiting Refinery Modernization The project BP’s ‘Operation Canadian…
/projects/whiting-refinery-modernization
Block 37
Project
Block 37 Keller met the challenges of this complex and fast-tracked project utilizing drilled shaft, slurry, and secant wall techniques. Block 37 The project Block 37 was to be repurposed as a…
/projects/block-37
Avens Bridge - South Holston Lake
Project
Avens Bridge - South Holston Lake Keller's innovative redesign of the floating platform helped overcome low water conditions. Avens Bridge - South Holston Lake The project Avens Bridge sees some…
/projects/avens-bridge-south-holston-lake
ATI Hot-Rolling and Processing Facility
Project
ATI Hot-Rolling and Processing Facility Keller constructed a water-tight secant retaining structure for the ATI Hot-Rolling and Processing Facility. ATI Hot-Rolling and Processing Facility 128 secant…
/projects/ati-hot-rolling-and-processing-facility
New Jersey High-Speed Rail Improvement
Project
New Jersey High-Speed Rail Improvement Keller performed construction in an active electrified railroad environment using specialized high rail and low overhead drill equipment. New Jersey High-Speed…
/projects/new-jersey-high-speed-rail-improvement
200 North Michigan Avenue
Project
200 North Michigan Avenue Keller protected existing adjacent structures' foundations while drilling at several locations containing existing timber piles. 200 North Michigan Avenue drilled…
/projects/200-north-michigan-avenue
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation
Project
Brooklyn Marine Terminal 8 Bulkhead Rehabilitiation Keller installed jet grout columns to provide structural support to the failing Brooklyn Marine Terminal 8 bulkhead. Brooklyn Marine Terminal 8…
/projects/brooklyn-marine-terminal-8
Hart Street Wastewater Pump Station Force Main Replacement
Project
Hart Street Wastewater Pump Station Force Main Replacement Jet grouted columns provide soil stabilization and support to piers piles, bearing 500-ton crane loads, during the construction of twin 48-…
/projects/hart-street-wwps
26th Street Emergency Repairs
Project
26th Street Emergency Repairs Our team responded to the emergency quickly and began work within days of the collapse. We found the optimal solution that reduced impact to the surrounding neighborhood…
/projects/26th-street-emergency-repairs
San Diego River Bridge Double Track
Project
San Diego River Bridge Double Track The selected technique constructed by Keller accelerated the contractor’s schedule four weeks by replacing compaction grouting with rigid inclusions. San Diego…
/projects/san-diego-river-bridge-double-track
Northern Arizona University Campus Hub
Project
Northern Arizona University Campus Hub Keller provided an alternate ground improvement solution, saving significant cost and time over the conventional deep foundation system originally considered.…
/projects/northern-arizona-university-campus-hub
Miami Children's Hospital
Project
Miami Children's Hospital During the construction of the Miami Children's Hospital, Keller used multiple techniques while controlling construction disturbance to hospital operations, staff…
/projects/miami-childrens-hospital
Preferred Freezer Warehouse
Project
Preferred Freezer Warehouse Rigid inclusions installed by Keller successfully supported foundations and heavy slab loads to avoid the use of deep foundations, structural slabs, and removal of…
/projects/preferred-freezer-warehouse
Thornton Tunnel Grouting
Project
Thornton Tunnel Grouting Keller’s tunnel grouting ensured continuity of the grout curtain around the 7.8 Billion Gallon CSO (combined sewage overflow) storage reservoir. Thornton Tunnel Grouting The…
/projects/thornton-tunnel-grouting
Pagination
Previous page
‹‹
Page 4
Next page
››