Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (837)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
National Corvette Museum Sinkhole
Project
National Corvette Museum Sinkhole Eight Corvettes were swallowed when a three-story deep sinkhole opened up directly beneath the National Corvette Museum. Our team mobilized within hours to provide…
/projects/national-corvette-museum-sinkhole
Eglinton Cross Passages
Project
Eglinton Cross Passages Keller improved surrounding soil to facilitate the tunnel construction of the Eglinton Crosstown light rail line. Eglinton Cross Passages Keller customized the drilling and…
/projects/eglinton-cross-passages
Bloomington Station
Project
Bloomington Station Keller provided a variety of ground improvement techniques while completing work two weeks in advance of schedule. Bloomington Station The project Metrolinx is building a new GO…
/projects/bloomington-station
Shand Carbon Capture Test Facility
Project
Shand Carbon Capture Test Facility Keller successfully completed construction within the operating power generating facility with zero safety incidents recorded. Shand Carbon Capture Test Facility…
/projects/shand-carbon-capture-test-facility
New Post Creek Generating Station
Project
New Post Creek Generating Station Keller continuously provided slurry material 24 hours per day, 7 days a week using an automated grout plant to complete the project. New Post Creek Generating…
/projects/new-post-creek-generating-station
Kanata West Pumping Station
Project
Kanata West Pumping Station Keller developed, designed, and constructed the optimal solution using multiple techniques to meet the project requirements. Kanata West Pumping Station The project The…
/projects/kanata-west-pumping-station
The Shipyards
Project
The Shipyards Keller installed a cantilevered wall, which was value-engineered to save the client more than $500k. The Shipyards The project Supply and installation of a secant pile wall with…
/projects/shipyards
96th Avenue
Project
96th Avenue Keller provided earth retention for a new building and completed the project in eight weeks with zero lost-time incidents. 96th Avenue The project Weststone Developments was constructing…
/projects/96th-avenue
Sunset Road Bridge
Project
Sunset Road Bridge Keller installed all twenty-one drilled shafts under very challenging slurry drilling techniques without any shaft remediation or repairs required. Sunset Road Bridge drilled shaft…
/projects/sunset-road-bridge
Loop 101 Project
Project
Loop 101 Project Keller completed drilled shaft installation safely while working next to an active highway. Loop 101 Project The project The Loop 101 Project planned to add new lanes in both…
/projects/loop-101-project
Vogtle Electric Generating Plant
Project
Vogtle Electric Generating Plant Keller was responsible for the excavation, survey, fabrication, and placement of reinforcing steel, handling/stockpiling of drill spoils, backfilling shafts poured…
/projects/vogtle-electric-generating-plant
OSIS Augmentation and Relief Sewer Tunnel
Project
OSIS Augmentation and Relief Sewer Tunnel Keller assisted in the completion of the OARS tunnel project, which helped Columbus reduce the environmental impacts caused by Combined Sewer Overflows (CSOs…
/projects/osis-augmentation-relief-sewer-tunnel
NSTAR Lower SEMA 345kV Transmission Line
Project
NSTAR Lower SEMA 345kV Transmission Line Keller successfully and safely performed work for the new 345kV transmission line that was adjacent to existing energized lines. NSTAR Lower SEMA 345kV…
/projects/nstar-lower-sema-345kv-transmission-line
North Central Reliability Project
Project
North Central Reliability Project Keller implemented and followed stringent environmental protocols due to work occurring in residential neighborhoods as well as many wetland areas. North Central…
/projects/north-central-reliability-project
Mullica River Bridge Widening
Project
Mullica River Bridge Widening Keller's success using drilled shafts in the sand formations of Southern NJ allowed the engineer and owner to see that this is a viable option in the area for…
/projects/mullica-river-bridge-widening
Cooper River Bridge
Project
Cooper River Bridge Keller completed this project that was scheduled to take 2 years in just 18 months. Cooper River Bridge aerial The project Massive drilled shafts were installed for SCDOT’s Cooper…
/projects/cooper-river-bridge
Leo Frigo Bridge Rehabilitation
Project
Leo Frigo Bridge Rehabilitation Keller completed all drilled shaft construction in less than 30 calendar days. Leo Frigo Bridge Rehabilitation Keller crew installing drilled shafts under the Leo…
/projects/leo-frigo-bridge-rehabilitation
Lake Travis Raw Water Intake Tunnel
Project
Lake Travis Raw Water Intake Tunnel Keller installed large diameter shafts to an extreme depth and completed the work safely and ahead of schedule. Lake Travis Raw Water Intake Tunnel The project A…
/projects/lake-travis-raw-water-intake-tunnel
Lake Champlain Bridge
Project
Lake Champlain Bridge During construction, Keller used multiple rock drilling techniques (reverse circulation bits, as well as downhole hammers) depending on the conditions encountered. Lake…
/projects/lake-champlain-bridge
Hurricane Deck Bridge
Project
Hurricane Deck Bridge Keller completed construction well ahead of schedule, allowing the completed bridge to open for traffic three months early. Hurricane Deck Bridge The project Hurricane Deck…
/projects/hurricane-deck-bridge

Pagination

  • Previous page ‹‹
  • Page 3
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe