Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (837)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
MSU Regency Athletic Complex
Project
MSU Regency Athletic Complex As an alternative to the originally proposed removal and replacement program, Keller performed dynamic compaction to improve the density of the fill material and provide…
/projects/msu-regency-athletic-complex
LACMTA Regional Connector Subway
Project
LACMTA Regional Connector Subway Keller offered an alternate remote horizontal directional drilling (HDD) plan to the specified compensation grout pipe installation approach, reducing the number of…
/projects/lacmta-regional-connector-subway
East Marginal Way South
Project
East Marginal Way South Keller provided a turn-key liquefaction mitigation ground improvement solution, allowing the client to begin above grade construction immediately after completion of our work…
/projects/east-marginal-way-south
Davidson County Solar Farm
Project
Davidson County Solar Farm Keller used a high-frequency variable moment vibratory hammer to complete the first 4-MW phase of a new single-axis tracking solar energy farm that would provide clean,…
/projects/davidson-county-solar-farm
Summer Lake Elementary School
Project
Summer Lake Elementary School Keller completed fencing, a stormwater pollution prevention plan (SWPPP), stone column installation, clearing, and grubbing approximately one week ahead of the owner’s…
/projects/summer-lake-elementary-school
One St. Petersburg
Project
One St. Petersburg One St. Petersburg is a 41-story luxury condominium tower and 13-story Hyatt hotel separated by an 8-story parking garage situated about a block inboard of the waterfront…
/projects/one-st-petersburg
The Venetian Resort and Casino - Palazzo Condo Tower
Project
The Venetian Resort and Casino - Palazzo Condo Tower Deep slurry wall technology was used to meet challenging engineering needs and the project schedule. Palazzo Condo Tower slurry wall The project…
/projects/venetian-resort-casino-palazzo-condo
4th Street Underpass
Project
4th Street Underpass Keller designed and constructed temporary shoring to support temporary railroad relocation (shoo-fly lines). 4th Street Underpass The project As part of Calgary’s effort to…
/projects/4th-street-underpass
15 Mile Road Sewer Repair
Project
15 Mile Road Sewer Repair Mobilization of multiple Keller crews for the emergency response stabilization work began within one working day of the initial site visit. 15 mile road low mobility…
/projects/15-mile-road-sewer-repair
University of Georgia Sanford Stadium
Project
University of Georgia Sanford Stadium Keller successfully completed low headroom auger cast piles on time and on budget while working around an aggressive, restricted college football schedule.…
/projects/university-georgia-sanford-stadium
Hard Rock Casino Tunnel
Project
Hard Rock Casino Tunnel Over the course of a year, Keller exceeded the client’s expectations by consistently completing all aspects of the work ahead of schedule. Hard Rock Casino Tunnel The project…
/projects/hard-rock-casino-tunnel
Texas Solar Facility
Project
Texas Solar Facility Keller installed over 30,000 driven piles to support this Solar Facility's solar panel and racking system. Texas Solar Facility solar panels The project Located just north…
/projects/texas-solar-facility
Caulks Creek
Project
Caulks Creek Keller's design of hydraulically pressed sheet piles with a jet grout bottom seal eliminated concern over vibrations damaging existing utilities and reduced groundwater infiltration…
/projects/caulks-creek
Division I Diversion Structure
Project
Division I Diversion Structure Keller performed the jet grouting work in a sensitive and congested environment without impacting or damaging numerous existing active utilities. Division I Diversion…
/projects/division-i-diversion-structure
Saint Louis University Hospital Renewal
Project
Saint Louis University Hospital Renewal Keller addressed highly variable subsurface conditions by tailoring each earth support method, providing the client with the most cost-effective solution while…
/projects/saint-louis-university-hospital-renewal
Annunciation Church
Project
Annunciation Church Keller used techniques previously used for historic structures and real-time monitoring to communicate positive results to the Diocese and maintain the integrity of the historic…
/projects/annunciation-church
Rail Car Assembly Facility
Project
Rail Car Assembly Facility Keller’s efficient and effective completion of the ground improvement work allowed for new foundation construction earlier than anticipated. Rail Car Assembly Facility…
/projects/rail-car-assembly-facility
Grand Valley State University Expansion
Project
Grand Valley State University Expansion Despite adverse winter weather conditions, Keller completed the vibro compaction work on time and within budget. Grand Valley State University Expansion…
/projects/grand-valley-state-university-expansion
Rolling Hills Wind Farm
Project
Rolling Hills Wind Farm Keller’s ability to assemble experienced personnel and resources in-house to perform all techniques under one turnkey contract streamlined the overall ground improvement/…
/projects/rolling-hills-wind-farm
LNG Steelton Facility Fuel Tank
Project
LNG Steelton Facility Fuel Tank Keller's ground improvement solution allowed the tank to economically meet American Petroleum Institute (API) settlement criteria without bringing contaminated…
/projects/lng-steelton-facility-fuel-tank

Pagination

  • Previous page ‹‹
  • Page 6
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe