Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (852)
  • Project (345)
  • Event (121)
  • News article (104)
  • Office (68)
  • Resource (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (5)
Request a quote
Get assistance
Boston University Center for Computer & Data Sciences
Project
Boston University Center for Computer & Data Sciences With its unique, award-winning design resembling a cantilevered stack of books, the Center for Computing & Data Sciences is a striking…
/projects/boston-university
University of Portland, Franz River Campus
Project
University of Portland, Franz River Campus Keller provided a ground improvement solution to mitigate lateral spreading and foundation support for new structures on the 35-acre Franz River campus.…
/projects/university-portland-franz-river-campus
CSX Camden Street
Project
CSX Camden Street In downtown Baltimore, increased flooding and impacted train operations led to a complete replacement of a storm drainage system, steps away from the Oriole’s Park at Camden Yards…
/projects/csx-camden-street
7620 Marie-Victorin
Project
7620 Marie-Victorin Upon the discovery of differing ground conditions, Keller provides design-build solution to get project back on track. construction site with drill rig The project A 12-story…
/projects/7620-marie-victorin
Chaplin Station
Project
Chaplin Station When unexpected movement and ground disturbance occurred following drilled shaft installation, Keller performed preventative grouting to keep the project on track. construction site…
/projects/chaplin-station
Alro Steel Expansion
Project
Alro Steel Expansion The 120-mile-long New Madrid Seismic fault line is one of the most prominent and historic seismic zones east of the Rocky Mountains. The probability of soil liquefaction and…
/projects/alro-steel-expansion
House of Imports - Mercedes Benz Service Center
Project
House of Imports - Mercedes Benz Service Center Obtaining the necessary city permits can be time-consuming, delaying what would otherwise be a short-duration project. Keller’s many decades of…
/projects/mercedes-benz-service-center
Zoo Atlanta - Grand New View
Project
Zoo Atlanta - Grand New View Zoo Atlanta first opened in 1889 and has undergone several renovations. Keller provided support of excavation as part of the zoo’s newest renovation, the “Grand New View…
/projects/zoo-atlanta-grand-new-view
Logan International Airport
Project
Logan International Airport Logan International Airport, owned and operated by the Massachusetts Port Authority (Massport), is one of the busiest airports in the northeastern United States, with…
/projects/logan-international-airport
The Print Shop Apartments
Project
The Print Shop Apartments Keller's design-build Vibro Pier® ground improvement system was the first approved and used in Clark County, Nevada. construction site The project Built on a parcel of…
/projects/print-shop-apartments
Wood Buffalo Flood Mitigation, Reach 5
Project
Wood Buffalo Flood Mitigation, Reach 5 Keller installs sheet piles as flood mitigation on the shore of the Clearwater River within a tight corridor near a high pedestrian area. rig with sheet piles…
/projects/wood-buffalo-flood-mitigation-reach-5
Aurum Road Wildlife Crossing
Project
Aurum Road Wildlife Crossing Keller provides slope stabilization and deep foundations for culvert construction that will allow wildlife to cross under the roadway. construction site The project With…
/projects/aurum-road-wildlife-crossing
Eglinton Crosstown Light Rail Transit (LRT)
Project
Eglinton Crosstown Light Rail Transit (LRT) The C$13 billion Eglinton Crosstown is a new 19km light-rail line that extends Toronto’s public transport system west, adding 25 stations and creating…
/projects/eglinton-crosstown-light-rail-transit-lrt
348 East South Temple
Project
348 East South Temple Keller designs and constructs the underpinning and support of the excavation (SOE) system for a new downtown Salt Lake City apartment complex. support of excavation wall The…
/projects/348-east-south-temple
Crane Valley Dam
Project
Crane Valley Dam Keller worked closely with the geotechnical engineer to design a dewatering system capable of maintaining drawdown a minimum of 3 ft below the excavation subgrade in low-permeability…
/projects/crane-valley-dam
Bear Creek Dam
Project
Bear Creek Dam Keller performed construction dewatering and excavation support during the Bear Creek Dam remediation program. construction site The project Bear Creek Dam, a 68-foot-high earthen…
/projects/bear-creek-dam
Beacon Hill Station
Project
Beacon Hill Station Dewatering wells effectively lowered groundwater levels up to 60 ft before excavation of the shaft and mining of the station. excavation of a shaft The project The Beacon Hill…
/projects/beacon-hill-station
Case Library, Colgate University
Project
Case Library, Colgate University Keller designed and constructed an earth retention and groundwater control system to support the expansion of an existing building. construction site The project The…
/projects/case-library-colgate-university
Cargill Canada
Project
Cargill Canada Keller provided a value-engineered auger cast design for a canola processing facility in Saskatchewan. construction site The project Canada is the largest canola-growing region…
/projects/cargill-canada
Brigantine Connector
Project
Brigantine Connector During the construction of the 2,900-ft-long tunnel/depressed roadway section of the Atlantic City-Brigantine Connector, a shallow penetrating dewatering system ensured a dry…
/projects/brigantine-connector

Pagination

  • Previous page ‹‹
  • Page 14
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe