Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Big Goose Creek Slope Rehabilitation
Project
Big Goose Creek Slope Rehabilitation Disaster struck when an 80-ft high slope in Sheridan, WY, underwent a major slide, displacing more than 50,000 cubic yards of material. Big Goose Creek Slope…
/projects/big-goose-creek-slope-rehabilitation
Port Lands Flood Protection
Project
Port Lands Flood Protection At the mouth of the Don River lies the Toronto Port Lands, a large, underdeveloped stretch of the downtown waterfront, created by infilling one of the largest wetlands in…
/projects/port-lands-flood-protection
Lowe’s High Plains Building 5
Project
Lowe’s High Plains Building 5 Keller’s expertise in providing design-build solutions delivers a deep foundation system for a Lowe’s warehouse on time and budget. Installing drilled shafts The project…
/projects/lowes-high-plains-building-5
NationWide Self Storage & AutoWash
Project
NationWide Self Storage & AutoWash Keller installs deep foundations and shoring solutions for new net-zero facility. Installing battered piles The project NationWide constructed a three-story…
/projects/nationwide-self-storage-autowash
East St. Louis Water Treatment Plant
Project
East St. Louis Water Treatment Plant The U.S. Environmental Protection Agency’s Long Term 2 Enhanced Surface Water Treatment Rule targets chlorine-resistant pathogens and microorganisms that feed…
/projects/east-st-louis-water-treatment-plant
Bonnybrook Wastewater Treatment Plant
Project
Bonnybrook Wastewater Treatment Plant The City of Calgary expands wastewater treatment plant to meet the growing population and increase energy efficiency. Installing micropiles The project The…
/projects/bonnybrook-wastewater-treatment-plant
5th Street improvement
Project
5th Street improvement Geotechnical projects near active railroad tracks are challenging for the owner and the geotechnical contractor. Heightened safety awareness and minimal impact to rail traffic…
/projects/5th-street-improvement
Rowlett Greenbelt Trail
Project
Rowlett Greenbelt Trail Adopted in 2001, the Six Cities Trail Plan proposed the construction of several hike and bike trails to form an inter-jurisdictional ‘spine system’ of recreational trails…
/projects/rowlett-greenbelt-trail
LNGC Heavy Haul Bridges
Project
LNGC Heavy Haul Bridges A joint venture between Keller, Haisla, and Ledcor Foundations provides a deep foundation solution for bridge replacement. Installing driven piles The project Three…
/projects/lngc-heavy-haul-bridges
Parallel Thimble Shoals Tunnel
Project
Parallel Thimble Shoals Tunnel Keller’s performance and expertise were key to providing deep foundations and excavation support for the area’s first bored transportation tunnel. Working on site The…
/projects/parallel-thimble-shoals-tunnel
The Wharf, Phase 2
Project
The Wharf, Phase 2 Keller delivers multiple techniques for a redevelopment project in D.C. along the Potomac River. Aerial of the Wharf site The project Prosperous as a fish market in the 1900s, the…
/projects/wharf-phase-2
Wolf Point South
Project
Wolf Point South Wolf Point South is the third and final phase of a multimillion-dollar megadevelopment by Hines Interests on the north bank of the Chicago River. Wolf Point South aerial The project…
/projects/wolf-point-south
Kapok Building & 16 Nexus Way
Project
Kapok Building & 16 Nexus Way Camana Bay is a vibrant waterfront destination town offering a range of attractions and living accommodations on Grand Cayman, the largest Cayman Island. As the…
/projects/kapok-building-16-nexus-way
The Milestone Project
Project
The Milestone Project Keller provides a deep foundation design-build solution, saving the owner time and money for a new potash mine facility near Regina. Two rigs on site The project As part of…
/projects/milestone-project
Preston Crossing Power Line
Project
Preston Crossing Power Line Keller provides a deep foundation solution for a new power line in Saskatoon. rig in snow The project SaskPower upgraded the Preston Crossing Substation by building a new…
/projects/preston-crossing-power-line
P&H Inland Grain Terminal
Project
P&H Inland Grain Terminal Keller designed and constructed a deep foundations solution for a new grain terminal, overcoming the challenges of changing weather conditions. rig installing drill…
/projects/ph-inland-grain-terminal
Lake Nona Wave Hotel
Project
Lake Nona Wave Hotel Located in the heart of Lake Nona’s foremost entertainment and shopping destination, the 16-story Wave Hotel, with its distinctive ocean wave silhouette, is the latest addition…
/projects/lake-nona-wave-hotel
Syncrude Base Mine Lake
Project
Syncrude Base Mine Lake As a previous mine pit and tailings pond, the Base Mine Lake has residual bitumen forming two mats on the lake floor. Keller designed and installed a shoring solution to…
/projects/syncrude-base-mine-lake
Osito Canyon Landslide Stabilization
Project
Osito Canyon Landslide Stabilization Slide events are common in Osito Canyon in the Angeles National Forest. During heavy rains in 2005, an approximately 900 ft long landslide occurred along the…
/projects/osito-canyon-landslide-stabilization
Miami 6-Arch Signature Bridge
Project
Miami 6-Arch Signature Bridge Keller installs auger cast piles for the first FDOT project in over half a century, supporting a new bridge in Miami. aerial of construction site The project As part of…
/projects/miami-6-arch-signature-bridge