Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
International Marketplace
Project
International Marketplace For decades, Honolulu’s original International Marketplace was a thriving open-air hub of small vendors plying their wares on a tract of land just one block from Waikiki…
/projects/international-marketplace
St Joseph’s Hospital Inpatient Tower
Project
St Joseph’s Hospital Inpatient Tower Keller’s soil mixing technology has proved to be effective for underground construction in Florida where complex subsurface soils typically coupled with high…
/projects/st-josephs-hospital-inpatient-tower
Razorback Stadium Upgrade
Project
Razorback Stadium Upgrade Keller’s proven ability to consistently meet hard completion dates was instrumental in keeping the underground construction portion of the Razorbacks Stadium upgrade on…
/projects/razorback-stadium-upgrade
Great Western Malting
Project
Great Western Malting Great Western Malting, located in the Port of Vancouver, WA along the Columbia River, is the oldest malting company in the western US, providing high-quality malts and specialty…
/projects/great-western-malting
San Jose State University
Project
San Jose State University Keller performed wet soil mixing to allow for the construction of the Interdisciplinary Science Building on the San Jose State University campus. Dry soil mixing being…
/projects/san-jose-state-university
102 E Tyler Street
Project
102 E Tyler Street The ability to value-engineer the design combined with a high level of service and a quality product are the building blocks of good client relationships that often lead to being a…
/projects/102-e-tyler-street
Overland Bridge Phase 1
Project
Overland Bridge Phase 1 Keller installed drilled shaft foundations to support the new construction for the Overland Bridge Transportation project. Installing drilled shafts between two bridges The…
/projects/overland-bridge-phase-1
Toronto General Hospital
Project
Toronto General Hospital Keller used an innovative three-phase drilling process to guarantee the safety of the existing tunnel and the quality of the access shafts. Installing drilled shafts The…
/projects/toronto-general-hospital
Access Shaft #3, Sistema de Potabilización Area Norte
Project
Access Shaft #3, Sistema de Potabilización Area Norte When Access Shaft #3 experienced persistent soil and groundwater ingress during excavation, Keller was contracted to design, furnish and oversee…
/projects/access-shaft-3
Dry Dock #8
Project
Dry Dock #8 Situated in the tidally influenced Elizabeth River, Norfolk Naval Shipyard in Portsmouth, VA, is the oldest and largest shipyard in the United States. No longer used for shipbuilding, the…
/projects/dry-dock-8
Tampa International Airport - Taxiway J Bridge Reconstruction
Project
Tampa International Airport - Taxiway J Bridge Reconstruction Part of the planned expansion at Tampa International Airport is the reconstruction of the Taxiway J Bridge. An aerial view of Taxiway J…
/projects/tampa-international-airport-taxiway-j
US 90 Bridge Enhancement over Yellow River
Project
US 90 Bridge Enhancement over Yellow River The existing, 1,617-ft-long US 90 bridge over Yellow River is located in an area considered navigable sovereign submerged land. The bridge span passes over…
/projects/us-90-bridge
Craney Island Eastward Expansion
Project
Craney Island Eastward Expansion The Virginia Port Authority seeks to increase its East Coast market share of container storage and distribution by taking advantage of Portsmouth’s deep water and…
/projects/craney-island-eastward-expansion
Trinity River Tunnel
Project
Trinity River Tunnel The Trinity River Tunnel is a small but critical portion of the 150-mile-long, $2.3 billion Integrated Pipeline (IPL) tunnel project in Dallas, TX. When the tunnel boring machine…
/projects/trinity-river-tunnel
Sound Transit Light Rail - Northgate Link Extension
Project
Sound Transit Light Rail - Northgate Link Extension For this project, Keller designed a ground freezing system that was wholly installed within the tunnels – the first-of-its-kind application in…
/projects/sound-transit-light-rail
First Street Tunnel
Project
First Street Tunnel DC Water and Sewer Authority's $2.6 billion Clean Rivers Project aims to nearly eliminate combined sewer overflows to the Anacostia and Potomac Rivers and Rock Creek, also…
/projects/first-street-tunnel
Wolf Creek Dam
Project
Wolf Creek Dam Wolf Creek Dam, completed in the late 1950s, is comprised of a 1,796-ft-long concrete gravity section and a 3,940-ft-long earthen embankment section, founded on karstic limestone.…
/projects/wolf-creek-dam
Routh Creek Bank Stabilization
Project
Routh Creek Bank Stabilization Keller’s value-engineered anchor re-design not only saved the client money but also reduced the estimated time for completion of the originally designed wall by…
/projects/routh-creek-bank-stabilization
PortMiami Terminal B
Project
PortMiami Terminal B PortMiami trademarks itself as the “Cruise Capital of the World”, with more than 5.5 million passengers passing through each year. It is a thriving cargo port accounting for more…
/projects/portmiami-terminal-b
Recreational Entertainment Facility
Project
Recreational Entertainment Facility After the failure of an MSE wall delayed the opening of a new recreational facility, the client called upon Keller to install a Micropile Slope Stabilization…
/projects/recreational-entertainment-facility
Pagination
Previous page
‹‹
Page 11
Next page
››