Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

News

Search all newsClear filters
Breadcrumb
  1. Home
  2. News
103 articles
Construction of the new Marriott Hotel in Austin, TX.
Project
Team effort delivers Austin Marriott project
Sep 20, 2018
Keller completed works on a new Marriott hotel in Austin, Texas.
Read article
Keller's Cutter Soil Mixing crew
Project
Keller completes their first CSM project in Canada
Sep 7, 2018
Keller completes their first cutter soil mixing project in Canada for a new mid-rise development.
Read article
Hard Rock Casino Tunnel
Project
Keller's a safe bet for Hard Rock
Jul 12, 2018
The iconic Hard Rock Hotel and Casino is undergoing a $1.8 billion expansion.
Read article
DC United Soccer Stadium
Project
United for Washington stadium project
Jun 14, 2018
Keller delivers a successful design-build project for D.C. United’s new soccer stadium.
Read article
 Celebrating International Women's Day
Workplace and people
Celebrating International Women's Day
Mar 8, 2018
International Women’s Day is celebrated yearly on March 8 to recognize the achievements of women.
Read article
Eglinton Cross Passages
Project
Keller tackles complex subway works
Jan 19, 2018
The C$5.3 billion Eglinton Crosstown line is Toronto’s biggest ever light rapid transit expansion.
Read article
Geo-instruments acquisition by Keller
Strategy
Keller expands instrumentation and monitoring capability
Apr 12, 2017
Keller has acquired instrumentation and monitoring company, GEO-Instruments, in North America.
Read article

Register for alerts

Read our privacy policy

Alert types
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe