Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro replacement (stone columns)
        • Wet soil mixing
        • Wick drains (PVDs)
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • Trenched soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (853)
  • Project (345)
  • Event (121)
  • News article (103)
  • Office (70)
  • Resource (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (5)
Request a quote
Get assistance
PDAC 2024
Event
PDAC 2024 Ontario, Canada Metro Toronto Convention Center Mar 3 - Mar 6, 2024 Conference / Trade Show https://www.pdac.ca/convention Come see us at booth 649. PDAC 2024: The World’s Premier Mineral…
/events/pdac-2024
Download
https://www.youtube.com/watch?v=4-ow1KaAvfs
Keller Sustainability Series E01: Kimberly Martin
Resource
Keller Sustainability Series E01: Kimberly Martin Sustainability series banner Video Kimberly's talk is titled "Sustainability in the Geotechnical Industry." Download https://www.…
/node/6086
Crane Valley Dam
Project
Crane Valley Dam Keller worked closely with the geotechnical engineer to design a dewatering system capable of maintaining drawdown a minimum of 3 ft below the excavation subgrade in low-permeability…
/projects/crane-valley-dam
Bear Creek Dam
Project
Bear Creek Dam Keller performed construction dewatering and excavation support during the Bear Creek Dam remediation program. construction site The project Bear Creek Dam, a 68-foot-high earthen…
/projects/bear-creek-dam
Paul Leonard appointed President of Keller North America
News article
Paul Leonard appointed President of Keller North America News article category Workplace and people Keller announces Paul Leonard has been appointed President of Keller North America, assuming the…
/news/paul-leonard-appointed-president-keller-north-america
Sustainability Series Episode 4: Alessandro Rotta Loria
Event
Sustainability Series Episode 4: Alessandro Rotta Loria Virtual Virtual Jul 16, 2024 Other https://www.eventbrite.com/e/keller-sustainability-series-episode-4-alessandro-… Join Keller and the Geo-…
/events/sustainability-series-episode-4-alessandro-rotta-loria
Beacon Hill Station
Project
Beacon Hill Station Dewatering wells effectively lowered groundwater levels up to 60 ft before excavation of the shaft and mining of the station. excavation of a shaft The project The Beacon Hill…
/projects/beacon-hill-station
Case Library, Colgate University
Project
Case Library, Colgate University Keller designed and constructed an earth retention and groundwater control system to support the expansion of an existing building. construction site The project The…
/projects/case-library-colgate-university
Cargill Canada
Project
Cargill Canada Keller provided a value-engineered auger cast design for a canola processing facility in Saskatchewan. construction site The project Canada is the largest canola-growing region…
/projects/cargill-canada
Driving excellence at Aston Martin Residences
News article
Driving excellence at Aston Martin Residences News article category Project As the high-profile Miami skyscraper celebrates its official opening, we look at back at how Keller provided a range of…
/news/driving-excellence-aston-martin-residences
Little Rock
Office
Little Rock Arkansas Arkansas T: 469-971-2385 14699712385 F: Little Rock, Arkansas Key contacts Kert Thielen, Senior Business Development Manager T: 469-971-2385 E: [email protected] Show…
/contact-us/little-rock
Fayetteville
Office
Fayetteville Arkansas Fayetteville T: 469-634-8415 4696348415 F: Fayetteville, Arkansas Kert Thielen, Senior Business Development Manager T: 469-634-8415 E: [email protected] Show More…
/contact-us/fayetteville
Oklahoma City
Office
Oklahoma City Oklahoma Oklahoma CIty T: 469-634-8415 4696348415 F: Oklahoma City, Oklahoma Kert Thielen, Senior Business Development Manager T: 469-634-8415 E: [email protected] Kent Abella…
/contact-us/oklahoma-city
Tulsa
Office
Tulsa Oklahoma Tulsa T: 469-634-8415 4696348415 F: Tulsa, Oklahoma Kert Thielen, Senior Business Development Manager T: 469-634-8415 E: [email protected] Kent Abella, Area Manager T: 469-853…
/contact-us/tulsa
Omaha
Office
Omaha Nebraska Omaha T: 402-533-3168 4025333168 F: 1299 Farnam Street Suite 300 Omaha, Nebraska 68102 Matthew Miller, Project Manager T: 402-533-3168 E: [email protected] Kent Abella, Area…
/contact-us/omaha
Austin
Office
Austin Texas Austin T: 972-292-0221 9722920221 F: Austin, Texas Matt Sotirin, Business Development Manager E: [email protected] Chris Robertson, Area Manager E: christopher.robertson@…
/contact-us/austin
San Antonio
Office
San Antonio Texas San Antonio T: 972-292-0221 9722920221 F: San Antonio, Texas Chris Robertson, Area Manager T: 972-292-0221 E: [email protected] Show More information on contact us…
/contact-us/san-antonio
Corpus Christi
Office
Corpus Christi Texas Corpus Christi T: 346-453-4556 13464534556 F: Corpus Christi, Texas Matthew Shaw, Branch Manager T: 346-453-4556 E: [email protected] Show More information on contact us…
/contact-us/corpus-christi
David Finocchio, P.E.
Content page
David Finocchio, P.E. man in blue suit David Finocchio is the Business Development Director of Keller in North America.  David holds a BS and MS in civil engineering from the University of…
/about-us/our-leadership/david-finocchio
Brigantine Connector
Project
Brigantine Connector During the construction of the 2,900-ft-long tunnel/depressed roadway section of the Atlantic City-Brigantine Connector, a shallow penetrating dewatering system ensured a dry…
/projects/brigantine-connector

Pagination

  • Previous page ‹‹
  • Page 31
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe