Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro replacement (stone columns)
Wet soil mixing
Wick drains (PVDs)
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
Trenched soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Back Cove Storage Facility
Project
Back Cove Storage Facility Keller installs remedial jet grout columns to facilitate cofferdam construction of new wastewater storage tanks. construction site and testing program The project As part…
/projects/back-cove-storage-facility
Grouting and Ground Improvement Course
Event
Grouting and Ground Improvement Course Colorado Colorado School of Mines - Golden, Colorado Jul 29 - Aug 1, 2024 Training course https://learn.mines.edu/ggi/agenda/ Grouting and Ground Improvement is…
/events/grouting-and-ground-improvement-course-0
GeoMontréal 2024
Event
GeoMontréal 2024 Quebec, Canada Hotel Bonaventure Montréal Sep 15 - Sep 18, 2024 Conference / Trade Show https://www.geomontreal2024.ca/ Come see us at GeoMontréal. The theme for GeoMontréal 2024 is…
/events/geomontreal-2024
Privacy Policy
Content page
Privacy Policy The purpose of this policy is to set out the responsibilities of the group in observing and upholding our position on collection, use and disclosure of personal information and is our…
/privacy-policy
ASDSO Dam Safety 2024
Event
ASDSO Dam Safety 2024 Denver, Colorado Colorado Convention Center Sep 22 - Sep 26, 2024 Conference / Trade Show https://damsafety2024.eventscribe.net/index.asp Come see us at booth 702. Dam Safety…
/events/asdso-dam-safety-2024
MINExpo 2024
Event
MINExpo 2024 Las Vegas, Nevada Las Vegas Convention Center Sep 24 - Sep 26, 2024 Conference / Trade Show https://www.minexpo.com/ Come see us at booth 2106. At MINExpo INTERNATIONAL®, the industry’s…
/events/minexpo-2024
Texas State Memorial Railroad Redoubt Stabilization
Project
Texas State Memorial Railroad Redoubt Stabilization Keller’s slope stabilization design and construction at the Vicksburg Military Park earned the 2022 Excellence in Construction award from the…
/projects/texas-state-memorial-railroad-redoubt-stabilization
DFI 49th Annual Conference on Deep Foundations
Event
DFI 49th Annual Conference on Deep Foundations Aurora, Colorado Gaylord Rockies Resort & Convention Center Oct 7 - Oct 10, 2024 Conference / Trade Show https://dfi-events.org/dfi49/index.html…
/events/dfi-49th-annual-conference-deep-foundations
Liquefaction mitigation
Solution
Liquefaction mitigation Liquefaction is a common problem in earthquake-prone areas where soils lose strength due to the ground motion and behave like a viscous liquid, damaging overlying structures.…
/expertise/solutions/liquefaction-mitigation
DBIA 2024 Design-Build Conference & Expo
Event
DBIA 2024 Design-Build Conference & Expo Texas Hilton Anatole Nov 6 - Nov 8, 2024 Conference / Trade Show https://dbia.org/design-build-conference-expo/ Come see us at booth 400. DBIA conferences…
/events/dbia-2024-design-build-conference-expo
ASCE Geo-Structures 2024
Event
ASCE Geo-Structures 2024 Pennsylvania Sheraton Pittsburgh Hotel at Station Square Nov 17 - Nov 20, 2024 Conference / Trade Show https://geo-structures.asce.org/ Come see us at booth 11. This…
/events/asce-geo-structures-2024
Isabella Lake Dam Safety Project
Project
Isabella Lake Dam Safety Project During construction at an existing high-risk dam, Keller provided dewatering, enabling embankment and foundation improvements that addressed drainage and seismic…
/projects/isabella-lake-dam-safety-project
Cannonsville Dam Emergency Remediation
Project
Cannonsville Dam Emergency Remediation Keller’s rapid response to developing and implementing an emergency groundwater control plan was key to quickly resolving a subsurface issue threatening dam…
/projects/cannonsville-dam-emergency-remediation
Dey Street Connector
Project
Dey Street Connector The Fulton Street Transit Center was constructed under the New York MTA’s Capital Construction Program to accommodate five subway stations handling nine lines. Keller completed…
/projects/dey-street-connector
ATCO 7L65 Line Rebuild
Project
ATCO 7L65 Line Rebuild Keller successfully installs deep foundations for a multi-phase transmission line overcoming harsh weather and meeting environmental restrictions. drill rig on site on a sunny…
/projects/atco-7l65-line-rebuild
Lowe’s of Temecula
Project
Lowe’s of Temecula Keller installs soil nails to remediate a failing retaining wall protecting a popular home improvement store. soil nail wall The project Located behind a Lowe’s Home Improvement…
/projects/lowes-temecula
Port Mann Water Main Supply Tunnel
Project
Port Mann Water Main Supply Tunnel Keller developed a liquid nitrogen ground freezing solution that allowed for safe access to inspect and repair the tunnel boring machine (TBM) cutter head that…
/projects/port-mann-water-main-supply-tunnel
Round Valley Reservoir
Project
Round Valley Reservoir Keller provides dewatering to facilitate dam rehabilitation. construction site at the bottom of the dam The project Originally constructed in 1962-63, the Round Valley…
/projects/round-valley-reservoir
Groundwater control and dewatering
Solution
Groundwater control and dewatering Groundwater control (also known as seepage control) involves the creation of barriers in soil, rock, or below-grade structures to restrict water movement. Keller…
/expertise/solutions/groundwater-control-and-dewatering
Kinder Morgan Bridge Abutment
Project
Kinder Morgan Bridge Abutment Keller installs CFA (auger cast) piles for pipe rack bridge abutment. construction site for bridge abutment The project Kinder Morgan constructed a new pipe rack,…
/projects/kinder-morgan-bridge-abutment
Pagination
Previous page
‹‹
Page 32
Next page
››