Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro stone columns (vibro replacement)
        • Wet soil mixing
        • Wick (PVD) drains
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement CFA piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked in piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Sculpted shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • TRD - Soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (837)
  • Project (340)
  • Event (112)
  • News article (103)
  • Resource (69)
  • Office (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (4)
Request a quote
Get assistance
Back Cove Storage Facility
Project
Back Cove Storage Facility Keller installs remedial jet grout columns to facilitate cofferdam construction of new wastewater storage tanks. construction site and testing program The project As part…
/projects/back-cove-storage-facility
Texas State Memorial Railroad Redoubt Stabilization
Project
Texas State Memorial Railroad Redoubt Stabilization Keller’s slope stabilization design and construction at the Vicksburg Military Park earned the 2022 Excellence in Construction award from the…
/projects/texas-state-memorial-railroad-redoubt-stabilization
Isabella Lake Dam Safety Project
Project
Isabella Lake Dam Safety Project During construction at an existing high-risk dam, Keller provided dewatering, enabling embankment and foundation improvements that addressed drainage and seismic…
/projects/isabella-lake-dam-safety-project
Cannonsville Dam Emergency Remediation
Project
Cannonsville Dam Emergency Remediation Keller’s rapid response to developing and implementing an emergency groundwater control plan was key to quickly resolving a subsurface issue threatening dam…
/projects/cannonsville-dam-emergency-remediation
Dey Street Connector
Project
Dey Street Connector The Fulton Street Transit Center was constructed under the New York MTA’s Capital Construction Program to accommodate five subway stations handling nine lines. Keller completed…
/projects/dey-street-connector
ATCO 7L65 Line Rebuild
Project
ATCO 7L65 Line Rebuild Keller successfully installs deep foundations for a multi-phase transmission line overcoming harsh weather and meeting environmental restrictions. drill rig on site on a sunny…
/projects/atco-7l65-line-rebuild
Lowe’s of Temecula
Project
Lowe’s of Temecula Keller installs soil nails to remediate a failing retaining wall protecting a popular home improvement store. soil nail wall The project Located behind a Lowe’s Home Improvement…
/projects/lowes-temecula
Port Mann Water Main Supply Tunnel
Project
Port Mann Water Main Supply Tunnel Keller developed a liquid nitrogen ground freezing solution that allowed for safe access to inspect and repair the tunnel boring machine (TBM) cutter head that…
/projects/port-mann-water-main-supply-tunnel
Round Valley Reservoir
Project
Round Valley Reservoir Keller provides dewatering to facilitate dam rehabilitation. construction site at the bottom of the dam The project Originally constructed in 1962-63, the Round Valley…
/projects/round-valley-reservoir
Kinder Morgan Bridge Abutment
Project
Kinder Morgan Bridge Abutment Keller installs CFA (auger cast) piles for pipe rack bridge abutment. construction site for bridge abutment The project Kinder Morgan constructed a new pipe rack,…
/projects/kinder-morgan-bridge-abutment
SPAHA Multi-Purpose Health Facility
Project
SPAHA Multi-Purpose Health Facility Keller installs deep foundations for a multi-purpose, Indigenous-led healthcare facility, serving the Key First Nation, Keeseekoose First Nation, and Cote First…
/projects/spaha-multi-purpose-health-facility
Santa Rosa Junior College Housing
Project
Santa Rosa Junior College Housing Keller’s Vibro Pier® design provided schedule and cost savings for a student housing facility. construction site with three rigs The project To provide more…
/projects/santa-rosa-junior-college-housing
RiverRenew Deep Shaft Depressurization
Project
RiverRenew Deep Shaft Depressurization Keller’s deep well depressurization system, installed ahead of schedule, prevented the heaving of challenging lower Potomac soils while constructing a new CSO…
/projects/riverrenew-deep-shaft-depressurization
Riverton Redevelopment
Project
Riverton Redevelopment Keller received the 2024 Groundwater Treatment Project of the Year award from The Dewatering Institute after successfully treating over 65 million gallons of water for a master…
/projects/riverton-redevelopment
John F. Kennedy Airport
Project
John F. Kennedy Airport Keller provides dewatering and groundwater treatment for airport upgrades. job site at JFK airport The project The John F. Kennedy Airport is currently under redevelopment to…
/projects/john-f-kennedy-airport
Aston Martin Residences
Project
Aston Martin Residences Keller’s multi-technique solution provides groundwater control and deep foundations for luxury high rise constructed feet away from Biscayne Bay. construction site next to the…
/projects/aston-martin-residences
Highway 401 Emergency Work
Project
Highway 401 Emergency Work Keller provides emergency grouting to stabilize the roadway following settlement from nearby tunneling. construction work on the side of a highway The project Highway 401…
/projects/highway-401-emergency-work
SPCC Remand
Project
SPCC Remand Keller installs over 800 drilled shafts for Saskatoon Correctional Center’s new remand center. Construction site in open field The project The Saskatoon Correctional Centre's new…
/projects/spcc-remand
Theodore Dam
Project
Theodore Dam Keller installed vibro stone columns (vibro replacement) to stabilize the slope of the Theodore Dam. construction on a slope The project Constructed in 1963/4, the Theodore Dam spans the…
/projects/theodore-dam
Bayway Refinery
Project
Bayway Refinery Installation of a 600-foot long, permanent biopolymer collection trench and barrier curtain wall for environmental remediation at the Bayway Refinery. construction rig at refinery The…
/projects/bayway-refinery

Pagination

  • Previous page ‹‹
  • Page 15
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe