Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro stone columns (vibro replacement)
Wet soil mixing
Wick (PVD) drains
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement CFA piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked in piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Sculpted shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
TRD - Soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Back Cove Storage Facility
Project
Back Cove Storage Facility Keller installs remedial jet grout columns to facilitate cofferdam construction of new wastewater storage tanks. construction site and testing program The project As part…
/projects/back-cove-storage-facility
Texas State Memorial Railroad Redoubt Stabilization
Project
Texas State Memorial Railroad Redoubt Stabilization Keller’s slope stabilization design and construction at the Vicksburg Military Park earned the 2022 Excellence in Construction award from the…
/projects/texas-state-memorial-railroad-redoubt-stabilization
Isabella Lake Dam Safety Project
Project
Isabella Lake Dam Safety Project During construction at an existing high-risk dam, Keller provided dewatering, enabling embankment and foundation improvements that addressed drainage and seismic…
/projects/isabella-lake-dam-safety-project
Cannonsville Dam Emergency Remediation
Project
Cannonsville Dam Emergency Remediation Keller’s rapid response to developing and implementing an emergency groundwater control plan was key to quickly resolving a subsurface issue threatening dam…
/projects/cannonsville-dam-emergency-remediation
Dey Street Connector
Project
Dey Street Connector The Fulton Street Transit Center was constructed under the New York MTA’s Capital Construction Program to accommodate five subway stations handling nine lines. Keller completed…
/projects/dey-street-connector
ATCO 7L65 Line Rebuild
Project
ATCO 7L65 Line Rebuild Keller successfully installs deep foundations for a multi-phase transmission line overcoming harsh weather and meeting environmental restrictions. drill rig on site on a sunny…
/projects/atco-7l65-line-rebuild
Lowe’s of Temecula
Project
Lowe’s of Temecula Keller installs soil nails to remediate a failing retaining wall protecting a popular home improvement store. soil nail wall The project Located behind a Lowe’s Home Improvement…
/projects/lowes-temecula
Port Mann Water Main Supply Tunnel
Project
Port Mann Water Main Supply Tunnel Keller developed a liquid nitrogen ground freezing solution that allowed for safe access to inspect and repair the tunnel boring machine (TBM) cutter head that…
/projects/port-mann-water-main-supply-tunnel
Round Valley Reservoir
Project
Round Valley Reservoir Keller provides dewatering to facilitate dam rehabilitation. construction site at the bottom of the dam The project Originally constructed in 1962-63, the Round Valley…
/projects/round-valley-reservoir
Kinder Morgan Bridge Abutment
Project
Kinder Morgan Bridge Abutment Keller installs CFA (auger cast) piles for pipe rack bridge abutment. construction site for bridge abutment The project Kinder Morgan constructed a new pipe rack,…
/projects/kinder-morgan-bridge-abutment
SPAHA Multi-Purpose Health Facility
Project
SPAHA Multi-Purpose Health Facility Keller installs deep foundations for a multi-purpose, Indigenous-led healthcare facility, serving the Key First Nation, Keeseekoose First Nation, and Cote First…
/projects/spaha-multi-purpose-health-facility
Santa Rosa Junior College Housing
Project
Santa Rosa Junior College Housing Keller’s Vibro Pier® design provided schedule and cost savings for a student housing facility. construction site with three rigs The project To provide more…
/projects/santa-rosa-junior-college-housing
RiverRenew Deep Shaft Depressurization
Project
RiverRenew Deep Shaft Depressurization Keller’s deep well depressurization system, installed ahead of schedule, prevented the heaving of challenging lower Potomac soils while constructing a new CSO…
/projects/riverrenew-deep-shaft-depressurization
Riverton Redevelopment
Project
Riverton Redevelopment Keller received the 2024 Groundwater Treatment Project of the Year award from The Dewatering Institute after successfully treating over 65 million gallons of water for a master…
/projects/riverton-redevelopment
John F. Kennedy Airport
Project
John F. Kennedy Airport Keller provides dewatering and groundwater treatment for airport upgrades. job site at JFK airport The project The John F. Kennedy Airport is currently under redevelopment to…
/projects/john-f-kennedy-airport
Aston Martin Residences
Project
Aston Martin Residences Keller’s multi-technique solution provides groundwater control and deep foundations for luxury high rise constructed feet away from Biscayne Bay. construction site next to the…
/projects/aston-martin-residences
Highway 401 Emergency Work
Project
Highway 401 Emergency Work Keller provides emergency grouting to stabilize the roadway following settlement from nearby tunneling. construction work on the side of a highway The project Highway 401…
/projects/highway-401-emergency-work
SPCC Remand
Project
SPCC Remand Keller installs over 800 drilled shafts for Saskatoon Correctional Center’s new remand center. Construction site in open field The project The Saskatoon Correctional Centre's new…
/projects/spcc-remand
Theodore Dam
Project
Theodore Dam Keller installed vibro stone columns (vibro replacement) to stabilize the slope of the Theodore Dam. construction on a slope The project Constructed in 1963/4, the Theodore Dam spans the…
/projects/theodore-dam
Bayway Refinery
Project
Bayway Refinery Installation of a 600-foot long, permanent biopolymer collection trench and barrier curtain wall for environmental remediation at the Bayway Refinery. construction rig at refinery The…
/projects/bayway-refinery
Pagination
Previous page
‹‹
Page 15
Next page
››