Skip to main content
english
  • english
  • Français
1 (800) 456-6548
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Locations
Home
Main Menu
  • Expertise
    • Techniques
      • Grouting
        • Compensation (fracture) grouting
        • High mobility (cement slurry) grouting
        • Injection systems
        • Jet grouting
        • Low mobility (compaction) grouting
        • Permeation (chemical) grouting
        • Rock / fissure grouting
        • Polyurethane grouting
        • Slab jacking
      • Ground improvement
        • Cutter soil mixing (CSM)
        • Dry soil mixing
        • Dynamic compaction
        • Mass soil mixing
        • Earthquake drains
        • Mixed modulus columns CMM®
        • Rapid impact compaction (RIC)
        • Rigid inclusions
        • Vibro compaction
        • Vibro concrete columns
        • Vibro (aggregate) piers®
        • Vibro replacement (stone columns)
        • Wet soil mixing
        • Wick drains (PVDs)
      • Deep foundations
        • Cased CFA piles
        • CFA (auger cast) / ACIP piles
        • Displacement piles
        • Drilled shafts
        • Driven piles
        • Franki piles (PIFs)
        • Helical (screw) piles
        • Jacked piles
        • Load bearing elements (barrettes)
        • Macropiles®
        • Micropiles
        • Tangent Bearing Elements (TBEs)
      • Earth retention
        • Access / drop shafts
        • Anchors
        • Anchor block slope stabilization
        • Diaphragm walls
        • Gabion systems
        • Interlocking pipe piles
        • Micropile slide stabilization system (MS3)
        • Pit underpinning
        • Shotcrete
        • Secant or tangent (contiguous) piles
        • Sheet piles
        • Soil nailing
        • Soldier piles and lagging
      • Groundwater control and dewatering
        • Dewatering
        • Ground freezing
        • Groundwater treatment
        • Trenched soil mix walls
        • Tremie bottom seals
        • Slurry cutoff walls
    • Solutions
      • Deep foundations
      • Environmental remediation
      • Ground improvement
      • Groundwater control and dewatering
      • Instrumentation and monitoring
      • Liquefaction mitigation
      • Releveling structures
      • Slope stabilization
      • Support of excavation
      • Underpinning
    • Markets
      • Coal Combustion Residuals (CCR)
      • Commercial
      • Industrial and manufacturing
      • Infrastructure
      • Institutional
      • Mining
      • Oil, gas and chemical
      • Power
      • Residential
      • Tanks
    • Design and build
  • Projects
  • How we work
    • Code of conduct
    • Health and safety
    • Inclusion commitments
    • Quality
    • Sustainability
    • Values
  • About us
    • Our affiliates
    • Our history
    • Our leadership
    • About Keller Group
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Locations
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (853)
  • Project (345)
  • Event (121)
  • News article (103)
  • Office (70)
  • Resource (68)
  • Content page (57)
  • Technique (54)
  • Market (20)
  • Solution (10)
  • Landing page (5)
Request a quote
Get assistance
Case Foundation, a Keller company
Content page
Case Foundation, a Keller company Founded on Chicago hardpan more than 60 years ago by Vernon Case, Case Foundation began as a local drilled shaft contractor. Case foundation logo Since its inception…
/case-foundation-keller-company
Keller project receives The Dewatering Institute Award
News article
Keller project receives The Dewatering Institute Award News article category Project Keller receives the 2024 Groundwater Treatment Project of the Year award from The Dewatering Institute (TDI) after…
/news/keller-project-receives-dewatering-institute-award
Keller Purchase Order Terms and Conditions
Content page
Keller Purchase Order Terms and Conditions View and download the standard Keller Purchase Order Terms and Conditions for Canada and the United States below. Documents Purchase Order Terms and…
/po-tc
Download
Purchase Order Terms and Conditions (Canada)
Resource
Purchase Order Terms and Conditions (Canada) PO document Policy Standard Keller Purchase Order Terms and Conditions for Canada. Download
/node/6491
Download
Purchase Order Terms and Conditions (US)
Resource
Purchase Order Terms and Conditions (US) PO document Policy Standard Keller Purchase Order Terms and Conditions for the United States. Download
/node/6496
Bayway Refinery
Project
Bayway Refinery Installation of a 600-foot long, permanent biopolymer collection trench and barrier curtain wall for environmental remediation at the Bayway Refinery. construction rig at refinery The…
/projects/bayway-refinery
Lyman Run Dam
Project
Lyman Run Dam Keller designed and installed a deep well system for groundwater control during construction of a new roller compacted replacement dam. dewatering wells and pipes across a dam The…
/projects/lyman-run-dam
Garden State Parkway Tunnel
Project
Garden State Parkway Tunnel Ground freezing was key to the successful of a TBM that had stalled beneath a critical highway. ground freezing pipes at tunnel shaft The project When loose subsurface…
/projects/garden-state-parkway-tunnel
Gibson County Coal Mine
Project
Gibson County Coal Mine Ground freezing is often specified for sinking production mine shafts through deep, water-bearing ground. The technique was first used at a US mine in 1888. ground freezing…
/projects/gibson-county-coal-mine
New York City Water Tunnel No. 3
Project
New York City Water Tunnel No. 3 An extensive instrumentation and monitoring program was instrumental in early diagnosis of moving groundwater at two shafts. Timely implementation of grouting ensured…
/projects/new-york-city-water-tunnel-no-3
Combined Sewer Overflow Tunnel
Project
Combined Sewer Overflow Tunnel Moving groundwater and groundwater contamination can inhibit freeze closure. Keller overcame these challenges with accurate and early diagnosis of the condition and…
/projects/combined-sewer-overflow-tunnel
Kansas Underground Salt Museum
Project
Kansas Underground Salt Museum The Hutchinson salt mine is an active salt mine in the United States with an underground museum open to the public. Ground freezing ensured dry and stable excavation of…
/projects/kansas-underground-salt-museum
First Morris Bank
Project
First Morris Bank When soil conditions were not amenable to conventional underpinning techniques, Keller’s design-build jet grouting solution provided both underpinning and excavation support in one…
/projects/first-morris-bank
No. 7 Subway Line Extension
Project
No. 7 Subway Line Extension When incompetencies in the rock were discovered, Keller was contracted to perform several techniques from their tunneling toolbox to keep operations on track. breakthrough…
/projects/no-7-subway-line-extension
World Trade Center Bathtub Rehab
Project
World Trade Center Bathtub Rehab Keller initiated a chemical grouting program to address groundwater leakage and potential ground loss through the damaged perimeter slurry wall “bathtub” area located…
/projects/world-trade-center-bathtub-rehab
New Madrid Power Plant Units 1 & 2
Project
New Madrid Power Plant Units 1 & 2 Keller installed, operated and maintained a deep well dewatering system for a very deep excavation at a power plant in the Mississippi River flood plain. aerial…
/projects/new-madrid-power-plant-units-1-2
Keller employees receive ADSC President’s Award
News article
Keller employees receive ADSC President’s Award News article category Workplace and people John Grillo and Martin McDermott receive the ADSC President’s Award at the recent annual meeting. Headshot…
/news/keller-employees-receive-adsc-presidents-award
Flamingo Water Resource Center
Project
Flamingo Water Resource Center Flamingo Water Resource Center is Clark County, Nevada's largest water treatment facility. It allows reclaimed water to be discharged back into Lake Mead. drill…
/projects/flamingo-water-resource-center
Warwick Hall Condo Development
Project
Warwick Hall Condo Development In a new residential development, Keller installs drilled shafts for the first of three buildings. two construction rigs drilling shafts on snowy construction site The…
/projects/warwick-hall-condo-development
Keller's mental health feature in Foundation Drilling
News article
Keller's mental health feature in Foundation Drilling News article category Workplace and people Banna Aparicio, Keller's Vice President of People, and Sandy-Lee Connolly, Keller's…
/news/mental-health-feature

Pagination

  • Previous page ‹‹
  • Page 35
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller 
Management Services, LLC

7550 Teague Road, Suite 300
Hanover, MD 21076

Footer links
  • Keller Group
  • Worldwide contacts
  • Careers
  • Vendor Registration Form
  • Purchase Order Terms and Conditions

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • EEO Policy
  • California Resident Privacy Notice
  • Manage cookies
  • Sitemap
Social links
  • Facebook
  • Instagram
  • LinkedIn
  • YouTube
ENR Top 600 Keller logo
Think Safe