Skip to main content
english
english
Français
1 (800) 456-6548
Service Menu
News
Events
Resources
Careers
Locations
Main Menu
Expertise
Techniques
Grouting
Compensation (fracture) grouting
High mobility (cement slurry) grouting
Injection systems
Jet grouting
Low mobility (compaction) grouting
Permeation (chemical) grouting
Rock / fissure grouting
Polyurethane grouting
Slab jacking
Ground improvement
Cutter soil mixing (CSM)
Dry soil mixing
Dynamic compaction
Mass soil mixing
Earthquake drains
Mixed modulus columns CMM®
Rapid impact compaction (RIC)
Rigid inclusions
Vibro compaction
Vibro concrete columns
Vibro (aggregate) piers®
Vibro replacement (stone columns)
Wet soil mixing
Wick drains (PVDs)
Deep foundations
Cased CFA piles
CFA (auger cast) / ACIP piles
Displacement piles
Drilled shafts
Driven piles
Franki piles (PIFs)
Helical (screw) piles
Jacked piles
Load bearing elements (barrettes)
Macropiles®
Micropiles
Tangent Bearing Elements (TBEs)
Earth retention
Access / drop shafts
Anchors
Anchor block slope stabilization
Diaphragm walls
Gabion systems
Interlocking pipe piles
Micropile slide stabilization system (MS3)
Pit underpinning
Shotcrete
Secant or tangent (contiguous) piles
Sheet piles
Soil nailing
Soldier piles and lagging
Groundwater control and dewatering
Dewatering
Ground freezing
Groundwater treatment
Trenched soil mix walls
Tremie bottom seals
Slurry cutoff walls
Solutions
Deep foundations
Environmental remediation
Ground improvement
Groundwater control and dewatering
Instrumentation and monitoring
Liquefaction mitigation
Releveling structures
Slope stabilization
Support of excavation
Underpinning
Markets
Coal Combustion Residuals (CCR)
Commercial
Industrial and manufacturing
Infrastructure
Institutional
Mining
Oil, gas and chemical
Power
Residential
Tanks
Design and build
Projects
How we work
Code of conduct
Health and safety
Inclusion commitments
Quality
Sustainability
Values
About us
Our affiliates
Our history
Our leadership
About Keller Group
Contact US Dropdown Menu
Contact us
Locations
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Case Foundation, a Keller company
Content page
Case Foundation, a Keller company Founded on Chicago hardpan more than 60 years ago by Vernon Case, Case Foundation began as a local drilled shaft contractor. Case foundation logo Since its inception…
/case-foundation-keller-company
Keller project receives The Dewatering Institute Award
News article
Keller project receives The Dewatering Institute Award News article category Project Keller receives the 2024 Groundwater Treatment Project of the Year award from The Dewatering Institute (TDI) after…
/news/keller-project-receives-dewatering-institute-award
Keller Purchase Order Terms and Conditions
Content page
Keller Purchase Order Terms and Conditions View and download the standard Keller Purchase Order Terms and Conditions for Canada and the United States below. Documents Purchase Order Terms and…
/po-tc
Download
Purchase Order Terms and Conditions (Canada)
Resource
Purchase Order Terms and Conditions (Canada) PO document Policy Standard Keller Purchase Order Terms and Conditions for Canada. Download
/node/6491
Download
Purchase Order Terms and Conditions (US)
Resource
Purchase Order Terms and Conditions (US) PO document Policy Standard Keller Purchase Order Terms and Conditions for the United States. Download
/node/6496
Bayway Refinery
Project
Bayway Refinery Installation of a 600-foot long, permanent biopolymer collection trench and barrier curtain wall for environmental remediation at the Bayway Refinery. construction rig at refinery The…
/projects/bayway-refinery
Lyman Run Dam
Project
Lyman Run Dam Keller designed and installed a deep well system for groundwater control during construction of a new roller compacted replacement dam. dewatering wells and pipes across a dam The…
/projects/lyman-run-dam
Garden State Parkway Tunnel
Project
Garden State Parkway Tunnel Ground freezing was key to the successful of a TBM that had stalled beneath a critical highway. ground freezing pipes at tunnel shaft The project When loose subsurface…
/projects/garden-state-parkway-tunnel
Gibson County Coal Mine
Project
Gibson County Coal Mine Ground freezing is often specified for sinking production mine shafts through deep, water-bearing ground. The technique was first used at a US mine in 1888. ground freezing…
/projects/gibson-county-coal-mine
New York City Water Tunnel No. 3
Project
New York City Water Tunnel No. 3 An extensive instrumentation and monitoring program was instrumental in early diagnosis of moving groundwater at two shafts. Timely implementation of grouting ensured…
/projects/new-york-city-water-tunnel-no-3
Combined Sewer Overflow Tunnel
Project
Combined Sewer Overflow Tunnel Moving groundwater and groundwater contamination can inhibit freeze closure. Keller overcame these challenges with accurate and early diagnosis of the condition and…
/projects/combined-sewer-overflow-tunnel
Kansas Underground Salt Museum
Project
Kansas Underground Salt Museum The Hutchinson salt mine is an active salt mine in the United States with an underground museum open to the public. Ground freezing ensured dry and stable excavation of…
/projects/kansas-underground-salt-museum
First Morris Bank
Project
First Morris Bank When soil conditions were not amenable to conventional underpinning techniques, Keller’s design-build jet grouting solution provided both underpinning and excavation support in one…
/projects/first-morris-bank
No. 7 Subway Line Extension
Project
No. 7 Subway Line Extension When incompetencies in the rock were discovered, Keller was contracted to perform several techniques from their tunneling toolbox to keep operations on track. breakthrough…
/projects/no-7-subway-line-extension
World Trade Center Bathtub Rehab
Project
World Trade Center Bathtub Rehab Keller initiated a chemical grouting program to address groundwater leakage and potential ground loss through the damaged perimeter slurry wall “bathtub” area located…
/projects/world-trade-center-bathtub-rehab
New Madrid Power Plant Units 1 & 2
Project
New Madrid Power Plant Units 1 & 2 Keller installed, operated and maintained a deep well dewatering system for a very deep excavation at a power plant in the Mississippi River flood plain. aerial…
/projects/new-madrid-power-plant-units-1-2
Keller employees receive ADSC President’s Award
News article
Keller employees receive ADSC President’s Award News article category Workplace and people John Grillo and Martin McDermott receive the ADSC President’s Award at the recent annual meeting. Headshot…
/news/keller-employees-receive-adsc-presidents-award
Flamingo Water Resource Center
Project
Flamingo Water Resource Center Flamingo Water Resource Center is Clark County, Nevada's largest water treatment facility. It allows reclaimed water to be discharged back into Lake Mead. drill…
/projects/flamingo-water-resource-center
Warwick Hall Condo Development
Project
Warwick Hall Condo Development In a new residential development, Keller installs drilled shafts for the first of three buildings. two construction rigs drilling shafts on snowy construction site The…
/projects/warwick-hall-condo-development
Keller's mental health feature in Foundation Drilling
News article
Keller's mental health feature in Foundation Drilling News article category Workplace and people Banna Aparicio, Keller's Vice President of People, and Sandy-Lee Connolly, Keller's…
/news/mental-health-feature
Pagination
Previous page
‹‹
Page 35
Next page
››