Please select your location to see the most relevant information from Keller
From urban development in Denver to infrastructure projects in remote and mountainous terrain, our team delivers solutions tailored to complex ground conditions.
Operating from our Denver office, we support projects throughout Colorado, Montana, North Dakota, South Dakota, Wyoming, New Mexico, and Nebraska.
5775 Eudora Street
Commerce City, CO 80022
Keller has a strong presence in Denver and the Front Range, supporting projects across a wide range of markets in one of the fastest-growing construction markets in the United States. We have been present in Colorado for over 40 years, employing over 300 professional and craft workers.
Our Denver-based teams specialize in:
With experience navigating Colorado’s variable soil profiles and seismic considerations, we deliver reliable geotechnical solutions from concept through construction.
Some of Keller’s local noteworthy projects include work on the Denver Broncos Stadium, I-70, I-25, Denver International Airport, and the Light Rail expansion from downtown to DIA.
In 2017, an 80-ft-tall slope near a junior high school began to fail. Without remediation, any further movement would block a creek at the toe of the slope and cause widespread local flooding. Keller, known worldwide for its innovative geotechnical solutions, devised a multi-technique solution to stabilize the slope and ensure stability.
First, Keller constructed a 20-ft-high soil nail wall, installing a total of 460 soil nails up to 35 ft long. A drainboard was installed behind the entire wall to collect and divert groundwater. Lower down, the team opted for a 20-ft-tall, anchored soldier pile wall. Over 140 soldier piles were installed up to 60 ft deep, along with two rows of high-capacity anchors. Behind the wall, horizontal drains were constructed to intercept groundwater and funnel it into a dedicated drainage system.
To further increase the safety of the slope at its base, Keller constructed a gabion retaining wall up to 8 ft high and 3 ft wide along the creek. Thirty-foot-long anchors were installed for the first row of baskets, with additional anchors every fourth row. Finally, shotcrete was applied, hand-carved, and stained to create a natural-looking finish.
We are very pleased with the collaborative effort between everyone involved including our local subcontractors, suppliers, and Sheridan community. The use of several remediation techniques provided a cost-effective long-term solution that is both functional and aesthetically pleasing.
Joe has more than four decades of experience in geotechnical construction and operations leadership. He began his career with Denver Grouting Services and advanced through roles including Project Manager, Area Manager, and Operations Manager before becoming Vice President, where he now oversees regional operations and specialized projects.